Skip to main content

New Benninghoven Batchmix 1250 built for quick transport and installation

Easy transportation and installation are key benefits of the new Benninghoven Batchmix 1250. “It’s highly mobile, and you only need one small crane for the erection,” said Martin Van Stek, Sales Manager with Benninghoven. The plant can be loaded on six trailers, which are built to quickly arrive at the next site. “You can travel at normal road speeds,” he said.
January 6, 2017 Read time: 2 mins
The Benninghoven 1250 utilises trailers that travel at normal road speeds.

Easy transportation and installation are key benefits of the new 167 Benninghoven Batchmix 1250.

“It’s highly mobile, and you only need one small crane for the erection,” said Martin Van Stek, Sales Manager with Benninghoven. The plant can be loaded on six trailers, which are built to quickly arrive at the next site. “You can travel at normal road speeds,” he said.

Implemented as a group with four feed hoppers and a loading width of 3,300mm, the cold feed system can be loaded with a wheel loader. The unit also features a loading ramp, which is folded away for transport.

The dryer drum and burner are located on a single chassis. Coordination between the dryer drum and burner ensures maximum productivity and efficiency.

The entire mixing tower is set up in its working position using just one 30tonne crane. The screen, which is also situated on the chassis during transport, is placed on the hot bin section in one stroke. The hot elevator is flange-mounted to the side of the chassis and pivoted. When lifting the mixing tower, the hot elevator automatically arrives at the working position.
A mobile bitumen tank with highly efficient insulation, together with a filling and dosing pump, is supplied as standard.

A mobile command cabin with optimally positioned windows provides a panoramic view of the mixing area. The mixing processes are documented individually, enabling excellent plant statistics and cost calculation.

For more information on companies in this article

Related Content

  • Efficient earthmoving builds new road links
    February 7, 2012
    Efficient earthmoving is allowing productive road construction in the Egyptian desert, Mike Woof reports. Despite ferocious desert temperatures, efficient earthmoving operations will help build new road links in Southern Egypt. Close to the Egyptian city of Assuit, the contractor Orascom is working on three key desert highway projects that will provide vital transport connections for the country's growing economy.
  • McCloskey Washing Systems eyes rapid growth
    March 9, 2017
    McCloskey Washing Systems (MWS) is targeting rapid growth after unveiling the Sandstorm 620 modular wash plant – the first of six new models the company has in production just 12 months after its launch. The Sandstorm range – 516, 620 and 824 – incorporates feeding, screening, aggregate and sand washing along with stockpiling all products on a single compact modular chassis.
  • Asphalt plant for Turkish highway project
    June 27, 2018
    An asphalt plant from Ammann is playing a key role in the construction of a new Turkish highway. An important factor in the selection of the plant for the construction of Turkey’s Northern Marmara Motorway was its ability to utilise fibres. A large portion of the motorway, which serves as a bypass of Istanbul, has been completed. Handling a good deal of the remaining work is Nalbantolu naat, a family-owned business founded in 1995. The company has completed a number of high-profile projects, including
  • Lintec & Linnhoff has a new plan for the Indian market
    May 4, 2021
    Lintec & Linnhoff has now ended its partnership agreement with Ardent Maschinenfabrik for the Indian market. Instead, Lintec & Linnhoff has new manufacturing plans for India and is planning to boost its facilities and resources in the country as demand continues to rise for its products.