Skip to main content

Nepal's road safety upgrade

The Nepalese authorities closed the incomplete third phase section of the BP highway to traffic following two fatal accidents recently. In all 58 people were killed in the two accidents on the Khurkot-Nepalthok stretch of the BP highway route, although construction work on the stretch has yet to be completed. So far 123km of the 158km route has been built by a Japanese contractor and these three stretches of the road have been opened to traffic. Of the remaining 37km being built, some 14km should be complet
April 26, 2012 Read time: 2 mins
RSSThe Nepalese authorities closed the incomplete third phase section of the BP highway to traffic following two fatal accidents recently. In all 58 people were killed in the two accidents on the Khurkot-Nepalthok stretch of the BP highway route, although construction work on the stretch has yet to be completed. So far 123km of the 158km route has been built by a Japanese contractor and these three stretches of the road have been opened to traffic. Of the remaining 37km being built, some 14km should be complete within five months. These most recent accidents and other incidents have highlighted the safety issues of the existing Khurkot-Nepalthok section, with the safety improvements now being prioritised. The upgrade work for this section will include widening the road and removing dangerous curves. In all the BP highway, which was planned in the late 1980s with input from Japanese body 6706 JICA, features four sections: Bardibas-Sindhuli Bazaaar; Sindhuli Bazaar-Khurkot; Khurkot-Nepalthok; Nepalthok-Dhulikel. Construction work commenced in 1996 on the highway, which is designed to improve transport connections between capital Kathmandu and Teria.

For more information on companies in this article

Related Content

  • Brake calls for tougher sentences for UK road death drivers
    May 28, 2014
    UK road safety charity Brake has renewed calls for tougher charges and penalties for drivers who kill and injure following the publication of British government criminal justice figures for 2013. The figures show the large proportion of drivers who kill and seriously injure being let off with relatively low penalties, reinforcing the importance of a forthcoming review of charges and penalties, recently announced by government. In total, 438 drivers were convicted of causing death or bodily harm. Just over
  • Stonehenge tunnel going ahead?
    September 12, 2017
    The preferred route has been announced for a new road and tunnel link on the A303 route in the UK that will bypass the famous Stonehenge stone circle. The project now finally looks as if it might go ahead after years of debate, although several hurdles have yet to be passed. The work calls for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel. The new route will be located further away from Stonehenge and the tunnel is being built
  • India to upgrade roads linking it to Bangladesh, Bhutan and Nepal
    September 21, 2016
    India has approved an ambitious US$1.04 billion project for constructing and upgrading 558km of roads to link it with Bangladesh, Bhutan and Nepal. India's Department of Economic Affairs has agreed to the project that will have 50% funding from the Asian Development Bank. A report by India’s independent newswire agency IANS noted that the work will be done within two years. "We have taken up five highway stretches in the country, which are very important for such a connectivity to succeed. This project i
  • Nepal's traffic improvements on track
    April 26, 2012
    Nepal's Department of Roads is now analysing traffic data based on research work into congestion carried out by consultants. Two local consulting firms were appointed to carry out a study of flyovers, underpasses and ramps in congested areas.