Skip to main content

Nepal's road safety upgrade

The Nepalese authorities closed the incomplete third phase section of the BP highway to traffic following two fatal accidents recently. In all 58 people were killed in the two accidents on the Khurkot-Nepalthok stretch of the BP highway route, although construction work on the stretch has yet to be completed. So far 123km of the 158km route has been built by a Japanese contractor and these three stretches of the road have been opened to traffic. Of the remaining 37km being built, some 14km should be complet
April 26, 2012 Read time: 2 mins
RSSThe Nepalese authorities closed the incomplete third phase section of the BP highway to traffic following two fatal accidents recently. In all 58 people were killed in the two accidents on the Khurkot-Nepalthok stretch of the BP highway route, although construction work on the stretch has yet to be completed. So far 123km of the 158km route has been built by a Japanese contractor and these three stretches of the road have been opened to traffic. Of the remaining 37km being built, some 14km should be complete within five months. These most recent accidents and other incidents have highlighted the safety issues of the existing Khurkot-Nepalthok section, with the safety improvements now being prioritised. The upgrade work for this section will include widening the road and removing dangerous curves. In all the BP highway, which was planned in the late 1980s with input from Japanese body 6706 JICA, features four sections: Bardibas-Sindhuli Bazaaar; Sindhuli Bazaar-Khurkot; Khurkot-Nepalthok; Nepalthok-Dhulikel. Construction work commenced in 1996 on the highway, which is designed to improve transport connections between capital Kathmandu and Teria.

For more information on companies in this article

Related Content

  • Road safety concepts aimed at developing nations
    October 31, 2012
    In this second of a two-part interview, Rohit Baluja introduces the work of the Delhi-based Institute of Road Traffic Education that he established in 1991 by way of practical response to the particular challenges of road safety in a developing world context Despite the alarming trends outlined in the first part of this article (World Highways: Vol.21, Issue No.6), Rohit Baluja remains optimistic that, if only the proper foundations of traffic management systems can be established, there is no reason why dr
  • The cost of crashes in the US
    May 25, 2023
    The financial cost of road crashes in the US places a heavy burden
  • Fast repair for key Cairo road
    July 14, 2015
    Fast repair of Cairo’s busy urban highway has been achieved using paving equipment. And MOBA levelling technology played an important role in ensuring finish quality met requirements. Cairo is Egypt’s fast-growing capital city, with an estimated population of around 20 million living in its catchment area. The city’s fast growth rate however has placed enormous demands on its infrastructure, with transportation creaking under the strain. An increasing numbers of people use the roads in and around Cairo ev
  • India pushing ahead with infrastructure projects
    July 4, 2012
    Despite the economic downturn, India looks to be pressing ahead with its major infrastructure projects to further boost its incredible growth. Patrick Smith reports India, which like most countries has been affected by the current economic climate, although not to the same extent, is pressing ahead with its ambitious highway construction plans. Each week new projects are completed, started or awarded as the nation seeks to improve its transportation requirements. These are needed to meet the aspirations of