Skip to main content

Nepal's road safety upgrade

The Nepalese authorities closed the incomplete third phase section of the BP highway to traffic following two fatal accidents recently. In all 58 people were killed in the two accidents on the Khurkot-Nepalthok stretch of the BP highway route, although construction work on the stretch has yet to be completed. So far 123km of the 158km route has been built by a Japanese contractor and these three stretches of the road have been opened to traffic. Of the remaining 37km being built, some 14km should be complet
April 26, 2012 Read time: 2 mins
RSSThe Nepalese authorities closed the incomplete third phase section of the BP highway to traffic following two fatal accidents recently. In all 58 people were killed in the two accidents on the Khurkot-Nepalthok stretch of the BP highway route, although construction work on the stretch has yet to be completed. So far 123km of the 158km route has been built by a Japanese contractor and these three stretches of the road have been opened to traffic. Of the remaining 37km being built, some 14km should be complete within five months. These most recent accidents and other incidents have highlighted the safety issues of the existing Khurkot-Nepalthok section, with the safety improvements now being prioritised. The upgrade work for this section will include widening the road and removing dangerous curves. In all the BP highway, which was planned in the late 1980s with input from Japanese body 6706 JICA, features four sections: Bardibas-Sindhuli Bazaaar; Sindhuli Bazaar-Khurkot; Khurkot-Nepalthok; Nepalthok-Dhulikel. Construction work commenced in 1996 on the highway, which is designed to improve transport connections between capital Kathmandu and Teria.

For more information on companies in this article

Related Content

  • Tamil Nadu road project in India
    April 9, 2020
    A key road project in India’s Tamil Nadu State has been awarded.
  • Vandals attack road fittings on key Nairobi road link
    April 24, 2013
    A wave of vandalism has hit a new superhighway from Nairobi as Shem Oirere reports. The newly opened 45km superhighway in Kenya’s capital Nairobi is facing a new challenge that threatens to erode its international standards and compromise the benefits it is meant to generate. A wave of vandalism targeting road fittings has hit the US$360 million highway linking Nairobi to Thika Town, posing a new challenge in the maintenance of the new road infrastructure in Kenya. The destruction delayed the completion of
  • Russia’s most expensive road project to commence
    January 15, 2019
    Construction work is being planned for Russia’s most expensive road, which will be built in south of the country – Eugene Gerden reports Work is due to commence shortly on Russia’s most expensive road, in the south of the country. The highway will form part of the existing 1,600km Moscow-Sochi road, according to recent statements from senior officials at the Russian Ministry of Transport as well as local analysts. As part of the project, the Russian Government, together with private investors, plans to
  • Polish road works continue for STRABAG
    March 1, 2022
    Work on a Polish road project continues for STRABAG.