Skip to main content

Nepal's road safety upgrade

The Nepalese authorities closed the incomplete third phase section of the BP highway to traffic following two fatal accidents recently. In all 58 people were killed in the two accidents on the Khurkot-Nepalthok stretch of the BP highway route, although construction work on the stretch has yet to be completed. So far 123km of the 158km route has been built by a Japanese contractor and these three stretches of the road have been opened to traffic. Of the remaining 37km being built, some 14km should be complet
April 26, 2012 Read time: 2 mins
RSSThe Nepalese authorities closed the incomplete third phase section of the BP highway to traffic following two fatal accidents recently. In all 58 people were killed in the two accidents on the Khurkot-Nepalthok stretch of the BP highway route, although construction work on the stretch has yet to be completed. So far 123km of the 158km route has been built by a Japanese contractor and these three stretches of the road have been opened to traffic. Of the remaining 37km being built, some 14km should be complete within five months. These most recent accidents and other incidents have highlighted the safety issues of the existing Khurkot-Nepalthok section, with the safety improvements now being prioritised. The upgrade work for this section will include widening the road and removing dangerous curves. In all the BP highway, which was planned in the late 1980s with input from Japanese body 6706 JICA, features four sections: Bardibas-Sindhuli Bazaaar; Sindhuli Bazaar-Khurkot; Khurkot-Nepalthok; Nepalthok-Dhulikel. Construction work commenced in 1996 on the highway, which is designed to improve transport connections between capital Kathmandu and Teria.

For more information on companies in this article

Related Content

  • New Zealand’s Waterview project is moving closer to completion
    December 13, 2016
    New Zealand’s biggest road project is less than a year away from completion, and a lot of progress has been made since World Highways last looked at the project two years ago - Mary Searle Bell reports New Zealand’s Waterview project is moving closer to completion and will be the largest road project in the country. The NZ$2 billion Western Ring Route will see the creation of an alternative motorway to State Highway 1, which runs through the centre of Auckland. The 47km-long motorway will allow a large p
  • Auckland Harbour bridge celebrates 50 years
    February 22, 2012
    The bridge over Auckland Harbour celebrates its half century this year, and it has been given a major upgrade to ensure that safety is maintained in New Zealand's largest city. Mary Searle reports. Auckland is New Zealand's largest city, home to nearly a third of the entire country's population. It's a sprawling metropolis, and its 1.3 million people are spread over 637km² of city, suburbs and islands. The Auckland Harbour Bridge, which celebrates its 50th birthday in May, is a vital link in the city's road
  • A new study is being carried out for a proposed bridge project for the UK’s Thames River
    April 4, 2012
    Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.
  • Massive German road investment required
    March 5, 2025
    German is requiring a massive investment in road development.