Skip to main content

Nepal's road safety upgrade

The Nepalese authorities closed the incomplete third phase section of the BP highway to traffic following two fatal accidents recently. In all 58 people were killed in the two accidents on the Khurkot-Nepalthok stretch of the BP highway route, although construction work on the stretch has yet to be completed. So far 123km of the 158km route has been built by a Japanese contractor and these three stretches of the road have been opened to traffic. Of the remaining 37km being built, some 14km should be complet
April 26, 2012 Read time: 2 mins
RSSThe Nepalese authorities closed the incomplete third phase section of the BP highway to traffic following two fatal accidents recently. In all 58 people were killed in the two accidents on the Khurkot-Nepalthok stretch of the BP highway route, although construction work on the stretch has yet to be completed. So far 123km of the 158km route has been built by a Japanese contractor and these three stretches of the road have been opened to traffic. Of the remaining 37km being built, some 14km should be complete within five months. These most recent accidents and other incidents have highlighted the safety issues of the existing Khurkot-Nepalthok section, with the safety improvements now being prioritised. The upgrade work for this section will include widening the road and removing dangerous curves. In all the BP highway, which was planned in the late 1980s with input from Japanese body 6706 JICA, features four sections: Bardibas-Sindhuli Bazaaar; Sindhuli Bazaar-Khurkot; Khurkot-Nepalthok; Nepalthok-Dhulikel. Construction work commenced in 1996 on the highway, which is designed to improve transport connections between capital Kathmandu and Teria.

For more information on companies in this article

Related Content

  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports
  • Bridge under discussion for UK’s River Thames
    June 19, 2012
    Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.