Skip to main content

Nepal’s road network continues to develop

Data from the Nepalese Government shows that work is on-going to upgrade the country’s road network. Public Road Statistics from the Ministry of Physical Planning, Works and Transport Management show that 1,180km of new roads have been constructed in Nepal in the 2011-2012 fiscal year. The statistics reveal that of the 1,180km of roads, 290km were surfaced with asphalt and 407km were gravel roads, while there were also 47 new bridges built in the period. The target for the 2011-2012 fiscal year however was
October 15, 2012 Read time: 2 mins
Data from the 5283 Nepalese Government shows that work is on-going to upgrade the country’s road network. Public Road Statistics from the Ministry of Physical Planning, Works and Transport Management show that 1,180km of new roads have been constructed in Nepal in the 2011-2012 fiscal year. The statistics reveal that of the 1,180km of roads, 290km were surfaced with asphalt and 407km were gravel roads, while there were also 47 new bridges built in the period. The target for the 2011-2012 fiscal year however was to construct 1,280km of new roads. But road connectivity has been improved in various parts of Nepal, with a new link to the Manang District for example. A new road connection has also been made through Lamjung to Chame, the district headquarters of Manag. Nepal’s Government has ambitious plans too that will connect some districts that have never previously been accessible by road, such as Humla and Dolpa.

Since Nepal embarked on its road construction programme, The Ministry of Physical Planning works and Transport Management said it has so far built 25,115km road, of which 11,565km is dirt road, 6,077km is gravel road and 7,474km is asphalt paved road. In Nepal, The Ministry of Physical Planning works and Transport Management oversees work on highways and feeder roads while municipal and district roads are overseen by local authorities.

Nepal’s road network has seen something of a boom with 6706 JICA recently completing a 14.5km section of the third phase of the BP Highway. The new Mid-Hill Highway and Kathmandu –Terai links are also open to traffic. Meanwhile in capital Kathmandu, construction or widening work is underway on 22 different road projects.

For more information on companies in this article

Related Content

  • Challenges of NMT in Nairobi, Dar es Salaam
    September 13, 2016
    Developing safety for non-motorised transport in East Africa - Shem Oirere writes. Despite increasing national budgetary allocations for the road sector in recent years, governments in East Africa have made very low investments in non-motorised transport (NMT). This is despite the fact that both Kenya and Uganda have recently passed a policy on pedestrian and cycling safety. In Kenya, the County government of Nairobi, the country’s capital, has embraced a NMT policy, while in Uganda the government has passe
  • Ethiopia races on with projects
    June 13, 2012
    Ethiopia is pursuing a 10-year $2.4 billion development plan, part of which are ambitious road developments. Shem Oirere reports Ethiopia is hastening its pace towards accessing a share of the East Africa commodity market and opening itself up for foreign investment through the implementation of an ambitious road development strategy, the Road Sector Development Programme (RSDP). The landlocked nation has convinced a number of international lenders of the viability of RSDP, with some of them now loosening
  • Canadian highway deal
    March 2, 2012
    Plans are now being worked on in Canada to extend the key Highway 407 in Ontario.
  • CECE equipment manufacturer’s conference in Berlin looks ahead for construction market growth
    October 29, 2012
    The construction equipment market has been hit hard in Europe and further afield, with economic uncertainty slowing orders. But there is light on the horizon. A range of key industry speakers made presentations at the recent Committee for European Construction Equipment (CECE) congress in Berlin, outlining prospects for the next few years in Europe as well as around the world.