Skip to main content

Nepal’s road network continues to develop

Data from the Nepalese Government shows that work is on-going to upgrade the country’s road network. Public Road Statistics from the Ministry of Physical Planning, Works and Transport Management show that 1,180km of new roads have been constructed in Nepal in the 2011-2012 fiscal year. The statistics reveal that of the 1,180km of roads, 290km were surfaced with asphalt and 407km were gravel roads, while there were also 47 new bridges built in the period. The target for the 2011-2012 fiscal year however was
October 15, 2012 Read time: 2 mins
Data from the 5283 Nepalese Government shows that work is on-going to upgrade the country’s road network. Public Road Statistics from the Ministry of Physical Planning, Works and Transport Management show that 1,180km of new roads have been constructed in Nepal in the 2011-2012 fiscal year. The statistics reveal that of the 1,180km of roads, 290km were surfaced with asphalt and 407km were gravel roads, while there were also 47 new bridges built in the period. The target for the 2011-2012 fiscal year however was to construct 1,280km of new roads. But road connectivity has been improved in various parts of Nepal, with a new link to the Manang District for example. A new road connection has also been made through Lamjung to Chame, the district headquarters of Manag. Nepal’s Government has ambitious plans too that will connect some districts that have never previously been accessible by road, such as Humla and Dolpa.

Since Nepal embarked on its road construction programme, The Ministry of Physical Planning works and Transport Management said it has so far built 25,115km road, of which 11,565km is dirt road, 6,077km is gravel road and 7,474km is asphalt paved road. In Nepal, The Ministry of Physical Planning works and Transport Management oversees work on highways and feeder roads while municipal and district roads are overseen by local authorities.

Nepal’s road network has seen something of a boom with 6706 JICA recently completing a 14.5km section of the third phase of the BP Highway. The new Mid-Hill Highway and Kathmandu –Terai links are also open to traffic. Meanwhile in capital Kathmandu, construction or widening work is underway on 22 different road projects.

For more information on companies in this article

Related Content

  • Highways England: new agency with long-term investment strategies
    August 18, 2015
    Highways England, created out of the old Highways Agency, was set up on April 1 to oversee a closer relationship between government client and private contractors. World Highways went to a recent forum in London to hear both sides declare their hopes and challenges. Government reforms are often met with a certain amount of scepticism thanks to years of disillusionment over forgotten ministerial promises. Given that, highway contractors in the UK could have been forgiven if they had raised their eyes skyward
  • US$690 million for Indonesia toll tunnel
    September 3, 2024
    Funding worth US$690 million is planned for Indonesia’s toll tunnel.
  • Hydrogen network for Germany
    November 14, 2024
    A hydrogen supply network is planned for Germany.
  • Cheaper, greener and less smelly; it’s all about the additives
    August 20, 2015
    The demand for bitumen additives is set to increase. Kristina Smith reports on some of the companies who are preparing to meet that increased demand. The variation in quality and composition of bitumen around the world is something that has been well-documented in these pages. Processing technologies for crude oil are changing, the way bitumen is traded is changing, and the final result can be a product that may not be all it seems – or huge variations from one shipment to another. Help is at hand, however,