Skip to main content

Nepal’s road network continues to develop

Data from the Nepalese Government shows that work is on-going to upgrade the country’s road network. Public Road Statistics from the Ministry of Physical Planning, Works and Transport Management show that 1,180km of new roads have been constructed in Nepal in the 2011-2012 fiscal year. The statistics reveal that of the 1,180km of roads, 290km were surfaced with asphalt and 407km were gravel roads, while there were also 47 new bridges built in the period. The target for the 2011-2012 fiscal year however was
October 15, 2012 Read time: 2 mins
Data from the 5283 Nepalese Government shows that work is on-going to upgrade the country’s road network. Public Road Statistics from the Ministry of Physical Planning, Works and Transport Management show that 1,180km of new roads have been constructed in Nepal in the 2011-2012 fiscal year. The statistics reveal that of the 1,180km of roads, 290km were surfaced with asphalt and 407km were gravel roads, while there were also 47 new bridges built in the period. The target for the 2011-2012 fiscal year however was to construct 1,280km of new roads. But road connectivity has been improved in various parts of Nepal, with a new link to the Manang District for example. A new road connection has also been made through Lamjung to Chame, the district headquarters of Manag. Nepal’s Government has ambitious plans too that will connect some districts that have never previously been accessible by road, such as Humla and Dolpa.

Since Nepal embarked on its road construction programme, The Ministry of Physical Planning works and Transport Management said it has so far built 25,115km road, of which 11,565km is dirt road, 6,077km is gravel road and 7,474km is asphalt paved road. In Nepal, The Ministry of Physical Planning works and Transport Management oversees work on highways and feeder roads while municipal and district roads are overseen by local authorities.

Nepal’s road network has seen something of a boom with 6706 JICA recently completing a 14.5km section of the third phase of the BP Highway. The new Mid-Hill Highway and Kathmandu –Terai links are also open to traffic. Meanwhile in capital Kathmandu, construction or widening work is underway on 22 different road projects.

For more information on companies in this article

Related Content

  • Connected vehicles: implications for road networks and mobility
    May 15, 2019
    Mobility services are expected to undergo spectacular changes within the next two decades with the introduction and widespread use of connected and autonomous vehicle (CAV) technology. However, the transition phase from human driving to self-driving will be gradual, requiring incremental interventions on the physical and digital road network to allow it to cope with mixed vehicular traffic. Cities such as Dubai have embraced the challenge by setting a target to reach 25% driverless trips by 2030 as part o
  • Solving congestion in Brisbane
    August 2, 2012
    Rapid growth in a major Australian city in recent years has created new problems for the infrastructure and especially transport Expansion in the city of Brisbane, the Queensland state capital and the third largest city in the country, is set to continue and some 1,500 people arrive/week from within Australia and from other parts of the world. At this rate by 2026 the city's population should increase by 1.4 million: at present it is 1.8 million. To cope, the Queensland government and city council have ini
  • Moroccan highway development programme
    July 3, 2023
    The Moroccan highway development programme continues.
  • Strabag secures US$2.23billion Italian motorway build project
    March 14, 2012
    The US$2.23billion (€1.7billion) contract to build the Pedemontana Lombarda motorway in northern Italy has been won by the Strabag consortium.