Skip to main content

Nepal's highway plans

The Nepalese Government is working on plans to build a series of highways that will improve north-south connectivity for this mountainous country.
March 22, 2012 Read time: 2 mins
Key infrastructure improvements are required in Nepal
The Nepalese Government is working on plans to build a series of highways that will improve north-south connectivity for this mountainous country.

A detailed project report (DPR) is underway and is due for completion in July, 2012. The new Karnali road will link Khulalu, Simikot and Hilsa and will be 286km long. The first phase of the Kaligandaki highway will link Gaindakot, Mirmi, Balubang and Phalebas in Parbat and will be 283km long, while its second phase will link Kusma, Phalebas, Setibeni and Mirmi and will be 98km long. The Koshi Corridor highway will pass through Basantapur in Terathum to Kimanthanka and will measure 195km long.

Preparation work was carried out during 2011 with work on the DPR also commencing. In all the planned roads will measure some 1,350km long and the Nepalese Government has already invested US$7.5 million in the DPR, although further funds will be required for the plans to be completed in detail. The various routes will present major engineering challenges however due to Nepal’s altitude and its complex geological conditions.

The scale of the work involved means that international funding sources are likely to be required to help Nepal develop the routes. The country's two large neighbours, China and India, have already provided funds for some of the infrastructure work carried out so far in Nepal and may well become involved in this programme also given the benefits to their own transport connections the plans could provide. The 2332 World Bank and the 943 Asian Development Bank could also be likely future sources of funds, although no announcements regarding financing have yet been released.

For more information on companies in this article

Related Content

  • Odebrecht wins Brazilian highway concession
    November 29, 2013
    Odebrecht has been awarded a concession for Brazil’s important BR-163 federal highway route. The 851km section of highway runs through Mato Grosso state and the deal is worth some US$2 billion, according to a report by Business News Americas. As part of its contract, Odebrecht will have to widen a 454km stretch of the route within five years and is also required to build nine new toll booths.
  • Nepal road repairs planned
    July 6, 2023
    Nepalese road repairs are being planned.
  • Latin America invests in infrastructure growth
    February 15, 2012
    Travelling in one of the world's most diverse regions is not always easy, but spectacular engineering feats will make life easier as Patrick Smith reports. Five years ago a report from the World Bank noted that infrastructure in most of Latin America and the Caribbean (LAC) had improved over the previous ten years.
  • Philippines bridge project receiving Chinese assistance?
    November 16, 2016
    Plans are moving forward with regard to the Iloilo-Guimaras-Negros Bridge in the Philippines. Building the 13.2km bridge is expected to cost up to US$457 million and take three years to be completed once the construction gets underway. The bridge will be built in the Visayas Region of the Philippines and would link a number of islands, replacing the ferry services in use at present. Chinese expertise may be employed to help design and construct the link while South Korean sources could deliver a portion of