Skip to main content

Nepal’s earthquake devastation revealed

Reports from Nepal highlight the devastation the country has suffered due to its recent massive earthquake. Measuring an enormous 7.8 on the Richter scale, the quake has demolished many buildings in capital Kathmandu, as well as damaging roads and other infrastructure. This was followed by a series of aftershocks, one of which measured 6.7 on the Richter scale. World Highways correspondent Ram Krishna Wagle reports that with many road links to other towns severely damaged, this is hampering the relief eff
April 30, 2015 Read time: 2 mins
Reports from Nepal highlight the devastation the country has suffered due to its recent massive earthquake. Measuring an enormous 7.8 on the Richter scale, the quake has demolished many buildings in capital Kathmandu, as well as damaging roads and other infrastructure. This was followed by a series of aftershocks, one of which measured 6.7 on the Richter scale.

3260 World Highways correspondent Ram Krishna Wagle reports that with many road links to other towns severely damaged, this is hampering the relief efforts right across the country. In some instances, only helicopters can be used to access the country’s more remote areas, but flights have been limited due to poor weather.
The photos show the damage to the Kathmandu Ringroad - Airport section and also the Kathmandu-Bhaktapur Road Section.

The fatality rate arising from the earthquake has now topped 5,500 while a further 11,000 are known to have been seriously injured. But with remote villages in many of the worst affected areas still to be contacted, the toll of dead and injured is almost certainly likely to climb higher. Aid is being provided from neighbouring China and India, as well as from Europe and the US, but considerably more international assistance is required. Equipment manufacturer 255 JCB has supplied a number of backhoe loaders and generators to aid in the rescue work but far more heavy equipment is required.

For more information on companies in this article

Related Content

  • New highway infrastructure planned for Nepal
    March 18, 2014
    Interest is said to be strong for a key highway project in Nepal. The project to build the US$1.02 billion Kathmandu-Tarai Fast Track route has attracted interest from China in the shape of the China Infrastructure Investment Corporation (CIIC) and from India with Reliance Infrastructure, and Shapoorji Pallonji. The 76km highway will commence at Khokana and connect capital Kathmandu with Nijgadh. Should CIIC win the deal it has said it will source funding from China’s Exim Bank. The project has been hit by
  • New Zealand's bridges survive earthquake
    February 7, 2012
    How is it that New Zealand's recent large and destructive earthquake did so little damage to the bridges in the quake zone? Mary Searle investigates. The magnitude 7.1 earthquake that hit the Canterbury region in New Zealand at 4.35am on Saturday, 4 September was similar in size to the quake that shook Haiti in January. However, the damage in Canterbury was minimal in comparison. A key contributor to this was New Zealand's preparedness for such an event. Positioned on a major fault line, New Zealand has ear
  • JCB loans machine fleet to aid British flood disaster relief work
    February 13, 2014
    JCB is reacting to the British flood disaster by deploying a €908,760 (£750,000) fleet of machines complete with operators to help stricken families. The company today announced that four of its high-speed, high ground clearance Fastrac tractors equipped with trailers and two of its iconic backhoe loaders were being despatched to the worst affected areas. The Fastrac tractors will be deployed in areas where people and livestock need moving from advancing flood waters. The JCB backhoe, with its ability t
  • The cost of crashes in the US
    May 25, 2023
    The financial cost of road crashes in the US places a heavy burden