Skip to main content

Nepal’s earthquake devastation revealed

Reports from Nepal highlight the devastation the country has suffered due to its recent massive earthquake. Measuring an enormous 7.8 on the Richter scale, the quake has demolished many buildings in capital Kathmandu, as well as damaging roads and other infrastructure. This was followed by a series of aftershocks, one of which measured 6.7 on the Richter scale. World Highways correspondent Ram Krishna Wagle reports that with many road links to other towns severely damaged, this is hampering the relief eff
April 30, 2015 Read time: 2 mins
Reports from Nepal highlight the devastation the country has suffered due to its recent massive earthquake. Measuring an enormous 7.8 on the Richter scale, the quake has demolished many buildings in capital Kathmandu, as well as damaging roads and other infrastructure. This was followed by a series of aftershocks, one of which measured 6.7 on the Richter scale.

3260 World Highways correspondent Ram Krishna Wagle reports that with many road links to other towns severely damaged, this is hampering the relief efforts right across the country. In some instances, only helicopters can be used to access the country’s more remote areas, but flights have been limited due to poor weather.
The photos show the damage to the Kathmandu Ringroad - Airport section and also the Kathmandu-Bhaktapur Road Section.

The fatality rate arising from the earthquake has now topped 5,500 while a further 11,000 are known to have been seriously injured. But with remote villages in many of the worst affected areas still to be contacted, the toll of dead and injured is almost certainly likely to climb higher. Aid is being provided from neighbouring China and India, as well as from Europe and the US, but considerably more international assistance is required. Equipment manufacturer 255 JCB has supplied a number of backhoe loaders and generators to aid in the rescue work but far more heavy equipment is required.

For more information on companies in this article

Related Content

  • XGMA crucial in Iran rescue
    November 23, 2012
    When a devastating 6.2 magnitude earthquake hit Iran’s northwestern province of East Azerbaijan earlier in 2012, the impact on the population was enormous. Over 300 people were killed while over 3000 were injured. XGMA’s Iranian dealer Sadaf Machine responded to the earthquake quickly by sending machines and operators to join the rescue operations in the town of Varzaghan near the City of Ahar and the provincial capital of Tabriz, just one day after the the earthquake struck. More than 80% of the buildings
  • Nepal road repairs and upgrades
    September 15, 2020
    A series of road repairs and upgrades are presently underway in Nepal.
  • Nepal safety issues
    April 27, 2012
    The authorities in Nepal are establishing a road safety plan that is intended to reduce the country’s annual injury and fatality rates. Nepal’s Traffic Police Directorate recently announced figures showing that of the 8,503 accidents recorded in the 2010-2011 financial year, 4,914 occurred within the Kathmandu Valley. The police also said that factors causing accidents included the poor state of gravel and surfaced roads and inadequate traffic signs. Potholes are a major problem on Nepal’s road system accor
  • The tender process for a key highway project in Nepal is opening
    October 15, 2019
    Tendering is opening for the consultation work for Nepal’s major Kathmandu-Terai/Madesh Expressway project. World Highways correspondent for Nepal, Ram Krishna Wagle, reports that the route will be designed to meet the Asian Highway Primary Class A standard. The work will review the previously completed detail engineering survey, detail design of expressway, the design of the expressway retaining structures, cross-drainage structures and drainage structures. It will also review river training structures, hi