Skip to main content

Nepal’s earthquake devastation revealed

Reports from Nepal highlight the devastation the country has suffered due to its recent massive earthquake. Measuring an enormous 7.8 on the Richter scale, the quake has demolished many buildings in capital Kathmandu, as well as damaging roads and other infrastructure. This was followed by a series of aftershocks, one of which measured 6.7 on the Richter scale. World Highways correspondent Ram Krishna Wagle reports that with many road links to other towns severely damaged, this is hampering the relief eff
April 30, 2015 Read time: 2 mins
Reports from Nepal highlight the devastation the country has suffered due to its recent massive earthquake. Measuring an enormous 7.8 on the Richter scale, the quake has demolished many buildings in capital Kathmandu, as well as damaging roads and other infrastructure. This was followed by a series of aftershocks, one of which measured 6.7 on the Richter scale.

3260 World Highways correspondent Ram Krishna Wagle reports that with many road links to other towns severely damaged, this is hampering the relief efforts right across the country. In some instances, only helicopters can be used to access the country’s more remote areas, but flights have been limited due to poor weather.
The photos show the damage to the Kathmandu Ringroad - Airport section and also the Kathmandu-Bhaktapur Road Section.

The fatality rate arising from the earthquake has now topped 5,500 while a further 11,000 are known to have been seriously injured. But with remote villages in many of the worst affected areas still to be contacted, the toll of dead and injured is almost certainly likely to climb higher. Aid is being provided from neighbouring China and India, as well as from Europe and the US, but considerably more international assistance is required. Equipment manufacturer 255 JCB has supplied a number of backhoe loaders and generators to aid in the rescue work but far more heavy equipment is required.

For more information on companies in this article

Related Content

  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the
  • Germany’s crumbling roads costing billions
    April 21, 2025
    Germany’s crumbling roads are costing billions to repair.
  • Trapped workers rescued from collapsed Indian tunnel
    November 29, 2023
    Construction workers in India have been rescued from a collapsed tunnel.
  • Airport's high demands on asphalt and concrete techniques
    July 11, 2012
    Airport runway, taxiway and parking areas make high demands on paving requirements, both with concrete and asphalt techniques. Mike Woof reports. High quality surface finishes are required in airport environments for runways, taxiways and aircraft parking areas. Because of the speed at which aircraft take off and land and the massive forces exerted due to the weight of the aircraft, particularly during landing, runway structures need to be incredibly strong. The surfaces also have to be constructed to very