Skip to main content

The Nepalese Government is investing in roads around capital Kathmandu

A new road-widening strategy is being put into effect in Nepal’s Kathmandu Valley. The aim of this programme is to reduce traffic jams on busy roads, especially during peak hours. A major problem for Kathmandu is that the current road the infrastructure in the city is not sufficient for the increasing numbers of vehicles. In a bid to tackle the problem, the authorities have initiated a programme of road widening in various areas of Kathmandu Valley. However, obstructions have been encountered due to residen
May 16, 2012 Read time: 2 mins
A new road-widening strategy is being put into effect in Nepal’s Kathmandu Valley. The aim of this programme is to reduce traffic jams on busy roads, especially during peak hours. A major problem for Kathmandu is that the current road the infrastructure in the city is not sufficient for the increasing numbers of vehicles. In a bid to tackle the problem, the authorities have initiated a programme of road widening in various areas of Kathmandu Valley. However, obstructions have been encountered due to residences that have hampered the road expansion process. The widening work includes a 300m section of the Nanigunj Gairidhar road, a 280m section of the Gairidhara Chhata Ganesh road, a 1000m stretch of the Gairidhara-Baluwatar road, a 150m section of the Gairidhara-Police Headquarters link, a 240m stretch of the Chabhil service track, 400m of the Balaju Bypass, 320m of the Maitedevi Setopul road and an 875m section of the Hanumanthan New Baneshwor road. Some 3565m in all is being widened by the Department of Roads. The new roads will have asphalt concrete surfaces as well as 1.5m wide pedestrian pavements on either side.

The road widening action is being carried out in keeping with a supreme court directive along with the Kathmandu Valley Development Authority Act, which took effect on April 13,2012. The Nepalese Government has deputed 200 civil servants at the Kathmandu Valley Town  Development Committee. The authorities say that bulldozing of structures built on encroached land will continue. However, Nepal’s prime minister Dr Baburam Bhattari has criticised the official at the Ministry for physical planning and works over delays in road-widening imitative. In addition, the former mayor of Kathmandu Metropolitian city Keshab Sthapit has been appointed as a commissioner of the newly formed Kathmandu Valley Development Authority (KVDA). Sthapit was the mayor of Kathmandu for five years and now has the remit of ensuring that the road widening work is carried out more effectively.

Related Content

  • Nepal's upgraded links
    May 25, 2012
    The Indian Government is providing assistance for road construction work in neighbouring Nepal. This assistance is for building the Kulekhani – Kathmandu road section, which will be widened and upgraded with an asphalt surface. The road will be widened to 7.5m and the work is being carried out by Indian Contractor Golden Goods. Meanwhile asphalt surfacing work is has now been completed on Nepal’s Hetauda-Bhimphedi-Kulekhani-Pharphing-Chaimale road Section. Surfacing work is in hand on the remaining 21km sec
  • Nepal road tunnel work commencing
    October 25, 2019
    Construction work is commencing on the Nepal First Tunnel Road project.
  • China helps Nepal plan capital ring road upgrade
    February 24, 2012
    China is providing technical assistance for the upgrading of the 27km ring road project for Nepalese capital Kathmandu.
  • Nepal highway subsidence problem causing traffic disturbance
    March 11, 2017
    Subsidence on a key stretch of highway in Nepal is causing major traffic disturbance. The BP Highway, also known as the Banepa- Sindhuli- Bardibas Road, has suffered subsidence on the Nepalthok-Khurkot stretch. The collapsed section measures 27m long and is causing delays for drivers. This Highway is an important route as it connets Nepal’s capital Kathmandu with Eastern Terai. Vehicles have been diverted to an alternative route, although part of the roadway is still being used to carry traffic in one d