Skip to main content

Nearly 4.5 million journeys made on UK city Carlisle’s new road in first year

Nearly 4.5 million journeys have been made on a northern England city’s key new road in its first year – prompting praise for its impact on reducing city centre traffic. Traffic counters positioned on the Carlisle Northern Development Route (the A689 which runs from Junction 44 of the M6 to the A595 Wigton Road) have shown that since the road opened on 14 February 2012, an estimated 4.416 million vehicles have been counted crossing its most popular point - the new bridge over the River Eden. This equates to
February 15, 2013 Read time: 2 mins
Nearly 4.5 million journeys have been made on a northern England city’s key new road in its first year – prompting praise for its impact on reducing city centre traffic.

Traffic counters positioned on the Carlisle Northern Development Route (the A689 which runs from Junction 44 of the M6 to the A595 Wigton Road) have shown that since the road opened on 14 February 2012, an estimated 4.416 million vehicles have been counted crossing its most popular point - the new bridge over the River Eden.

This equates to an average of 12,100 vehicles (including 880 HGVs) a day using this part of the road.

The new 8.25km (5.13 mile) road, built as part of a 30-year, US$273.03 million (£176m) PFI-funded contract with Connect Roads, part of 1146 Balfour Beatty, is also said to be having a positive impact on reducing traffic flows through the centre of Carlisle. Traffic counters positioned on Eden Bridge on the A7 in the city centre are registering over three million fewer vehicles a year now compared with before the road opened.

Cumbria County Council says the benefit that the road has brought to businesses is clear as HGVs are not only registered as using the road, but also the number of HGVs in the city centre has dropped. Eden Bridge, for example, used to register 850,000 HGVs crossing it in a year before CNDR opened, but is now showing 538,000 HGVs. Other city centre areas indicate the number of HGVs dropping by around a half.

For more information on companies in this article

Related Content

  • New Holland 'space savers'
    February 15, 2012
    Zero tailswing excavators from New Holland are part of a plant deal won by civil engineering contractor K Rouse with Balfour Beatty. The machines, 11 E135BSRs and two smaller models, the E80 and E50, are being used on a section of the M621 motorway near the city of Leeds, northern England, to remove existing metal crash barriers and install improved drainage prior to the erection of a new concrete central reservation.
  • Balfour works nights on Scotland’s Perth Transport Futures project
    July 31, 2017
    The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.
  • UK road contracts planned
    December 13, 2021
    Major road contracts are planned for the UK.
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.