Skip to main content

Nearly 4.5 million journeys made on UK city Carlisle’s new road in first year

Nearly 4.5 million journeys have been made on a northern England city’s key new road in its first year – prompting praise for its impact on reducing city centre traffic. Traffic counters positioned on the Carlisle Northern Development Route (the A689 which runs from Junction 44 of the M6 to the A595 Wigton Road) have shown that since the road opened on 14 February 2012, an estimated 4.416 million vehicles have been counted crossing its most popular point - the new bridge over the River Eden. This equates to
February 15, 2013 Read time: 2 mins
Nearly 4.5 million journeys have been made on a northern England city’s key new road in its first year – prompting praise for its impact on reducing city centre traffic.

Traffic counters positioned on the Carlisle Northern Development Route (the A689 which runs from Junction 44 of the M6 to the A595 Wigton Road) have shown that since the road opened on 14 February 2012, an estimated 4.416 million vehicles have been counted crossing its most popular point - the new bridge over the River Eden.

This equates to an average of 12,100 vehicles (including 880 HGVs) a day using this part of the road.

The new 8.25km (5.13 mile) road, built as part of a 30-year, US$273.03 million (£176m) PFI-funded contract with Connect Roads, part of 1146 Balfour Beatty, is also said to be having a positive impact on reducing traffic flows through the centre of Carlisle. Traffic counters positioned on Eden Bridge on the A7 in the city centre are registering over three million fewer vehicles a year now compared with before the road opened.

Cumbria County Council says the benefit that the road has brought to businesses is clear as HGVs are not only registered as using the road, but also the number of HGVs in the city centre has dropped. Eden Bridge, for example, used to register 850,000 HGVs crossing it in a year before CNDR opened, but is now showing 538,000 HGVs. Other city centre areas indicate the number of HGVs dropping by around a half.

For more information on companies in this article

Related Content

  • UK motorway bridge work
    June 10, 2025
    A new bridge now spans the UK’s busy M6 motorway.
  • Balfour Beatty wins road contract for Norfolk
    November 27, 2015
    Balfour Beatty has been awarded a €147.72 million (£104 million) road scheme by Norfolk County Council to complete works on the Norwich Northern Distributor Road (NNDR). The new road will serve Broadland, Norfolk, and improve access to North Norfolk and Norwich International Airport, with better links to Great Yarmouth and the south of the region. It will also bring relief on congested and unsuitable roads around the north and east of Norwich and improve capacity for future growth in jobs and housing.
  • Balfour Beatty awarded €54.01 million A1 improvement scheme
    June 5, 2014
    Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England. The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.
  • Upgrade work starts on junction of London’s orbital motorway M25
    February 20, 2015
    Work has started on a €136 million road improvement project on the UK’s London ring road, the M25 motorway. Crews from Balfour Beatty and Skanska have moved onto the interchange between the A13 national road and the M25 at junction 30 near Thurrock in the county Essex. The A13 on approach to the junction will be widened to four lanes in each direction and the junction itself will have dedicated link roads between the M25 and the A13. “Traffic at the junction is expected to grow by up to a quarter b