Skip to main content

Nationalisation plan for Madrid motorways

The Spanish Ministry of Development is considering nationalising the loss-making radial motorways in Madrid through state-owned company Seittsa. The plan would involve putting in place a toll-payment system to generate revenues to pay interests on debts and maintenance of the roads. The Ministry has already detected 600 locations where remote controlled payment systems could be installed in Madrid to charge those using the roads. The same plan includes a project to nationalise all motorways in Madrid at ris
July 2, 2012 Read time: 2 mins
The Spanish Ministry of Development is considering nationalising the loss-making radial motorways in Madrid through state-owned company Seittsa. The plan would involve putting in place a toll-payment system to generate revenues to pay interests on debts and maintenance of the roads. The Ministry has already detected 600 locations where remote controlled payment systems could be installed in Madrid to charge those using the roads. The same plan includes a project to nationalise all motorways in Madrid at risk of default: four radial roads, plus the AP-41 (Madrid-Toledo), and the M-12 (Airport Axis). Seittsa would pay a token US$1.25 for each of them and it would assume their debts. Radial No2 is being operated by 2717 Ferrovial and it has debts of over US$530 million, while radials Nos 3 and 5 are in the hands of Abertis and bear a debt of US$820 million. Radial no 4 is being run by Ferrovial and 3959 Sacyr and has a debt of US$700 million. Moreover, 1392 Isolux, Comsa and 5289 Azvi operate the AP-41 and it has filed for administration after registering US$462 million debts, and the M-12, which is run by 980 OHL, recorded US$350 debts.

For more information on companies in this article

Related Content

  • ACE/AECOM report: private sector and user-pay for English roads
    May 14, 2018
    It’s one minute to midnight for funding England’s roads, according to a timely new report, and the clock’s big hand is pointing to some form of user-pay solution, reports David Arminas Is there any way out of future user-pay funding for England’s highway infrastructure? The answer is a resounding ‘no’, according to the recently published report: Funding Roads for the Future. The brief 25-page document by the London-based Association for Consultancy and Engineering, ACE**, sums up the state of England’s ro
  • Advanced, low emission, fuel efficient earthmoving
    February 23, 2012
    Manufacturers are rolling out sophisticated machines for the European, North American and Japanese markets - Mike Woof reports. This year has been a pivotal period for the development of advanced, low emission earthmoving machines. During 2011 an array of manufacturers have introduced new models designed to comply with the latest Stage IIIB/Tier 4 Interim emissions regulations introduced for
  • Tackling the UK's traffic congestion
    February 28, 2012
    The biggest problem on UK roads is congestion, and there is no shortage of ideas as to how it should be tackled. Patrick Smith reports. Congestion (and how to relieve it), along with safety, are among the top priorities facing those responsible for looking after the UK's roads. Road pricing, car-share lanes, greener vehicle initiatives and alternative methods of transport such as buses, trams and rail are all part of the approach, but prior to the current economic climate the nation's love affair with the c
  • Chile highways subject to negotiation
    July 13, 2016
    Key highway links in Chile are likely to see upgrading, although the operation of the links could change. The country’s Ministry of Public Works (MOP) is keen to see widening work for Ruta 68, a route currently operated by Abertis. However MOP has not revealed if it intends to buy back the Ruta 68 contract from the operator and then put the highway back out to tender, with the new deal then including the widening work. It may prove simpler to strike a new deal with Abertis that includes the necessary highwa