Skip to main content

National Highways calls in the dogs

England’s National Highways agency has brought in several dogs to sniff out the invasive Japanese knotweed plant on the M25 junction 10 upgrade project.
By David Arminas December 5, 2023 Read time: 3 mins
Two legs good, four legs better: Sniffer pooch Nica finds hidden patches of Japanese knotweed, a problem weed that can grow more than 2m high (image courtesy National Highways)

In an effort to tackle invasive Japanese knotweed on their M25 junction 10 upgrade, National Highways has enlisted the help of some four-legged friends.

Japanese knotweed often develops into dense thickets and although it dies back over winter, it regrows in the spring, shooting up to more than 2m high and with its large leaves suppressing most other plant growth.

National Highways called on three highly trained sniffer dogs – Fenix the Dutch Shepherd and Spaniels Nica and Nettle – to root out the weed and prevent it spreading. The specially trained dogs can sniff out the plant’s rhizomes – roots and shoots that grow horizontally under the soil and from which the plant stems periodically shoot upwards. When the dogs detect Japanese knotweed, they freeze to alert their handler. This allows National Highways to take swift action to eradicate the plant and prevent further spread.

If not found and dealt with, the plant can cause serious problems to buildings and structures. It’s also an offence under a UK Wildlife and Countryside to allow the invasive plants to spread in the wild, which is why National Highways called in the canine specialists to help solve the issue.

Pippa Jordan, environment lead on National Highways M25 J10 improvement scheme, said conservation plays an important role in the agency’s construction projects. “Before we start, we create a map of the area which shows nearby plant species allowing us to tackle any invasive species growing on the construction site.

“In this case, we decided to put our paws on the pavement and take a unique approach to tackling the Japanese knotweed. These sniffer dogs are not only adorable, but also incredibly skilled at detecting the presence of unwanted plants, especially those not readily visible,” said Jordan.

Kat Janczur, owner and handler at Canine Detection Solutions which supplied the dogs, said the dogs can pick up the scent that Japanese knotweed rhizome gives off into the soil. Each dog, however, can be worked for only 30 minutes before requiring rest for at least the same time to keep efficiency levels up.

All dogs successfully found several areas where rhizomes were located underground. These areas would have been missed until the next season that the plant would have sprouted. Japanese knotweed can lay dormant for up to 20 years, so using detection dogs allowed for a full site clear, regardless of the state of the plant.

A study by Advanced Invasives in 2021 found that the same dogs which were used by National Highways found knotweed in under 60 seconds from being released to do their work. This was after the weed and several variants had not sprouted in three years, which can lead to people believing that the plant had been eradicated. The dogs knew better.

Advanced Invasives is an invasive plant species consultancy based in Cardiff, Wales.

For more information on companies in this article

Related Content

  • Tackling the UK's traffic congestion
    February 28, 2012
    The biggest problem on UK roads is congestion, and there is no shortage of ideas as to how it should be tackled. Patrick Smith reports. Congestion (and how to relieve it), along with safety, are among the top priorities facing those responsible for looking after the UK's roads. Road pricing, car-share lanes, greener vehicle initiatives and alternative methods of transport such as buses, trams and rail are all part of the approach, but prior to the current economic climate the nation's love affair with the c
  • Costain completes Cornish construction project
    August 2, 2024
    Costain has completed a key Cornish construction project.
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Brine spraying can boost winter road safety and cut materials costs
    February 16, 2015
    A study on the use of a brine sprayer on the A8 Autobahn in Germany has yielded valuable data - *Jo Rommeswinkel writes. Since 2007, Autobahnplus Services (a+S) has been providing the operation and maintenance services on the 52km concession Autobahn A8 between Munich and Augsburg in Bavaria, a region renowned for its severe winter maintenance conditions. The Munich Augsburg section comprises 48km of six-lane dual carriageway and 4km of four-lane dual carriageway. Part of the road surface consists of low-no