Skip to main content

Mumbai tunnel supply deal for Herrenknecht

German firm Herrenknecht has scored a major order for the Mumbai Coastal Road project in India.
By MJ Woof December 20, 2024 Read time: 2 mins
The Indian ambassador to Germany visited Herrenknecht’s facility at Schwanau in Germany


German firm Herrenknecht has secured the contract to supply the tunnel boring machines (TBMs) for road tunnels at Mumbai Coastal Road Project North.
The new TBMs will be used to drive tunnel stretches for the Versova-Dahisar Link Road in Mumbai. The two Mixshields will each feature a diameter of 15.62m, making them the largest tunnel boring machines in India. 

The Versova-Dahisar Link Road (VDLR) is the second phase of the Mumbai Coastal Road Project (MRCP), spanning a length of 23km. Packages C & D are the two parallel Underground tunneling packages of VDLR project, each extending 3.1km in length. The planned project will connect the suburbs of Versova and Dahisar along Mumbai's western coastline, easing traffic congestion on major routes such as the Western Express Highway. Underground tunnel sections will play a critical role, particularly in connecting sensitive areas such as the city centre and densely built urban regions. The project owner is Brihanmumbai Municipal Corporation, and the client is Megha Engineering & Infrastructures Ltd (MEIL).

The two powerful Mixshields are optimally designed for the challenging geological conditions of the region: slightly weathered basalt with a uniaxial compressive strength (UCS) of up to 150MPa. The overburden of the tunnels ranges between approximately 13-23m. To ensure safe operations under these conditions, the TBMs are designed for a maximum operating pressure of 5bar. The machines will be manufactured at Herrenknecht's Chennai plant in India, using core components from Schwanau. 

 

 

For more information on companies in this article

Related Content

  • Doosan’s powerful new compressor suits duties in extraction markets
    January 31, 2013
    Doosan Portable Power is offering its new large 25/280 portable compressor, which meets Stage IIIB/Tier 4 Interim emission regulations. The 25/280 portable compressor has a free air delivery of 28.3m³/min at a rated operating pressure of 25.1bar. Dual pressure regulation is a standard feature of the 25/280 compressor, allowing it to supply compressed air at operating pressures of both 25.1 or 17.2 bar. Dual pressure regulation expands the scope of applications for the 25/280 compressor which includes poweri
  • World growth in geosynthtics set to rise
    February 17, 2012
    With geosynthetics sales set to grow rapidly in the next three years, manufacturers are preparing for the demand. Patrick Smith reports. Global demand for geosynthetics is projected to increase 5.3% annually to 4.7 billion m² in 2013 with countries such as China, India and Russia expected to post the strongest gains through the forecast period. All are building large-scale infrastructure developments and face evolving environmental protection regulations and strict building construction codes.
  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.
  • Italian road contract awarded
    November 11, 2020
    Italian road contract awarded to Donati and BESIX.