Skip to main content

Mumbai tunnel supply deal for Herrenknecht

German firm Herrenknecht has scored a major order for the Mumbai Coastal Road project in India.
By MJ Woof December 20, 2024 Read time: 2 mins
The Indian ambassador to Germany visited Herrenknecht’s facility at Schwanau in Germany


German firm Herrenknecht has secured the contract to supply the tunnel boring machines (TBMs) for road tunnels at Mumbai Coastal Road Project North.
The new TBMs will be used to drive tunnel stretches for the Versova-Dahisar Link Road in Mumbai. The two Mixshields will each feature a diameter of 15.62m, making them the largest tunnel boring machines in India. 

The Versova-Dahisar Link Road (VDLR) is the second phase of the Mumbai Coastal Road Project (MRCP), spanning a length of 23km. Packages C & D are the two parallel Underground tunneling packages of VDLR project, each extending 3.1km in length. The planned project will connect the suburbs of Versova and Dahisar along Mumbai's western coastline, easing traffic congestion on major routes such as the Western Express Highway. Underground tunnel sections will play a critical role, particularly in connecting sensitive areas such as the city centre and densely built urban regions. The project owner is Brihanmumbai Municipal Corporation, and the client is Megha Engineering & Infrastructures Ltd (MEIL).

The two powerful Mixshields are optimally designed for the challenging geological conditions of the region: slightly weathered basalt with a uniaxial compressive strength (UCS) of up to 150MPa. The overburden of the tunnels ranges between approximately 13-23m. To ensure safe operations under these conditions, the TBMs are designed for a maximum operating pressure of 5bar. The machines will be manufactured at Herrenknecht's Chennai plant in India, using core components from Schwanau. 

 

 

For more information on companies in this article

Related Content

  • Herrenknecht delivers small diameter shaft drilling solution
    January 6, 2017
    Herrenknecht has developed a boxhole boring machine (BBM), based on its proven microtunnelling pipe jacking technology. The BBM1100 has been designed to drill slot holes and inclined shafts with a diameter of up to 1.1m and a maximum length of 30m. The machine uses a compact crawler base, with a modular jacking frame, cable drum and power pack that can be positioned separately if required.
  • Herrenknecht delivers small diameter shaft drilling solution
    April 14, 2013
    Herrenknecht has developed a boxhole boring machine (BBM), based on its proven microtunnelling pipe jacking technology. The BBM1100 has been designed to drill slot holes and inclined shafts with a diameter of up to 1.1m and a maximum length of 30m. The machine uses a compact crawler base, with a modular jacking frame, cable drum and power pack that can be positioned separately if required.
  • Two major Indian highway links under construction
    July 21, 2022
    Two major Indian highway links are under construction.
  • Qatar tunnel project benefits from sophisticated formwork
    March 7, 2018
    A sophisticated formwork solution has played an important part in the construction of a new road and rail tunnel in Qatar in the Middle East. The formwork system was supplied by ULMA, which supplied its equipment for the construction of the Lusail Boulevard Tunnel in Qatar. The new tunnel provides access to the new Lusail City Development, from the heart of Doha and will be a vital transport link for the planned 2022 FIFA World Cup tournament. The overall Lusail City Development, located 15km north of Do