Skip to main content

Mumbai tunnel supply deal for Herrenknecht

German firm Herrenknecht has scored a major order for the Mumbai Coastal Road project in India.
By MJ Woof December 20, 2024 Read time: 2 mins
The Indian ambassador to Germany visited Herrenknecht’s facility at Schwanau in Germany


German firm Herrenknecht has secured the contract to supply the tunnel boring machines (TBMs) for road tunnels at Mumbai Coastal Road Project North.
The new TBMs will be used to drive tunnel stretches for the Versova-Dahisar Link Road in Mumbai. The two Mixshields will each feature a diameter of 15.62m, making them the largest tunnel boring machines in India. 

The Versova-Dahisar Link Road (VDLR) is the second phase of the Mumbai Coastal Road Project (MRCP), spanning a length of 23km. Packages C & D are the two parallel Underground tunneling packages of VDLR project, each extending 3.1km in length. The planned project will connect the suburbs of Versova and Dahisar along Mumbai's western coastline, easing traffic congestion on major routes such as the Western Express Highway. Underground tunnel sections will play a critical role, particularly in connecting sensitive areas such as the city centre and densely built urban regions. The project owner is Brihanmumbai Municipal Corporation, and the client is Megha Engineering & Infrastructures Ltd (MEIL).

The two powerful Mixshields are optimally designed for the challenging geological conditions of the region: slightly weathered basalt with a uniaxial compressive strength (UCS) of up to 150MPa. The overburden of the tunnels ranges between approximately 13-23m. To ensure safe operations under these conditions, the TBMs are designed for a maximum operating pressure of 5bar. The machines will be manufactured at Herrenknecht's Chennai plant in India, using core components from Schwanau. 

 

 

For more information on companies in this article

Related Content

  • Record breaking underground parking facility for Shanghai
    August 4, 2023
    CRCHI is helping build a record breaking underground parking facility in Shanghai
  • Kier picks up London tunnel deal
    February 1, 2021
    The eight-year maintenance contract includes the Blackwall and Rotherhithe tunnels.
  • Seattle’s Alaskan Way tunnel on track
    March 8, 2013
    Plans are on track for construction work on Seattle’s Alaskan Way tunnel to commence in mid-2013. The massive TBM that will drive the tunnel has been tested in Japan by its manufacturer Hitachi and is now being shipped to the US. The TBM has a 17.5m diameter cutting head, making it the largest machine ever constructed. This is bigger even than the Herrenknecht machine with its 15.62m diameter cutting head built for the Bologna-Florence highway tunnel project in Italy. The new Hitachi TBM has been disassembl
  • Liebherr piling machines on Vietnam road project
    March 7, 2018
    Crucial piling work for the elevated approach to a bridge at Haiphong in Vietnam has been carried out by a Liebherr rig Highly productive and reliable, the Liebherr LB36-410 rig has been used to complete piles for the new bridge link. The machine has had success drilling through waterlogged ground and has helped to keep the project on schedule. Vietnamese ground engineering and foundations specialist contractor, Dua Fat Foundation Joint Stock Company has been using the Liebherr LB 36-410 rotary drillin