Skip to main content

Mumbai Airport on the up

To handle the increasing number of passengers and larger cargo volumes, Chhatrapati Shivaji International Airport in Mumbai, India, has been undergoing a continuous process of expansion since 2006. As part of the ambitious project Indian construction and mechanical engineering company Larsen & Toubro (L&T) is building a new multi-storey parking structure and a new air traf c control tower. Among equipment being used are Terex CTT 181-8 and CTT 231-10 tower cranes. The two flat top tower cranes are mainly u
August 24, 2012 Read time: 1 min
A Terex crane working at Mumbai Airport
To handle the increasing number of passengers and larger cargo volumes, Chhatrapati Shivaji International Airport in Mumbai, India, has been undergoing a continuous process of expansion since 2006.

As part of the ambitious project Indian construction and mechanical engineering company Larsen & Toubro (L&T) is building a new multi-storey parking structure and a new air traf c control tower. Among equipment being used are 1222 Terex CTT 181-8 and CTT 231-10 tower cranes. The two flat top tower cranes are mainly used to provide the workers with the steel and concrete needed to build the two structures.

Able to reach heights of nearly 30m and with 35m-long jibs, they can lift up to 10tonnes for the parking structure and 8tonnes for the tower.

The projects are scheduled for completion by December, 2013.

For more information on companies in this article

Related Content

  • Advanced method for South Africa bridge construction
    May 16, 2016
    A sophisticated construction method has been used for the first time in South Africa for a suspended bridge project This novel method of bridge construction was used on a major road upgrade project for the South African National Roads Agency Limited (SANRAL). Main contractor Lonerock Construction, and subcontractor Tzandeboo Construction, used RMD Kwikform’s Megatruss system to construct a 60m-long bridge while suspended mid-air over the live N4 highway. Lonerock Construction’s US$8.5 million (R132
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi
  • Powerful and productive pavers for the US market
    February 21, 2012
    New US-style pavers are coming to market, writes Mike Woof. Paving Techniques for the North American market focus on productivity, with manufacturers offering new machines specially for this sector. The US paving market is very different from Europe, with manufacturers having focussed on productivity so as to be able to surface the country’s long distance highway construction projects.
  • Innovations in concrete paving technology
    March 16, 2012
    Paving with concrete offers a strong and long life base for a roadway, with manufacturers continuing to develop technologies – Mike Woof reports. Innovation comes fast in the concrete paving market with a number of specialist suppliers offering an array of solutions to meet the needs of slipforming contractors. These machines can be used for a range of applications from large-scale airport runway or highway construction duties, tunnel jobs, bridge decks, barriers, traffic islands and kerbs. Because the app