Skip to main content

Mumbai Airport on the up

To handle the increasing number of passengers and larger cargo volumes, Chhatrapati Shivaji International Airport in Mumbai, India, has been undergoing a continuous process of expansion since 2006. As part of the ambitious project Indian construction and mechanical engineering company Larsen & Toubro (L&T) is building a new multi-storey parking structure and a new air traf c control tower. Among equipment being used are Terex CTT 181-8 and CTT 231-10 tower cranes. The two flat top tower cranes are mainly u
August 24, 2012 Read time: 1 min
A Terex crane working at Mumbai Airport
To handle the increasing number of passengers and larger cargo volumes, Chhatrapati Shivaji International Airport in Mumbai, India, has been undergoing a continuous process of expansion since 2006.

As part of the ambitious project Indian construction and mechanical engineering company Larsen & Toubro (L&T) is building a new multi-storey parking structure and a new air traf c control tower. Among equipment being used are 1222 Terex CTT 181-8 and CTT 231-10 tower cranes. The two flat top tower cranes are mainly used to provide the workers with the steel and concrete needed to build the two structures.

Able to reach heights of nearly 30m and with 35m-long jibs, they can lift up to 10tonnes for the parking structure and 8tonnes for the tower.

The projects are scheduled for completion by December, 2013.

For more information on companies in this article

Related Content

  • Special formwork solution for tricky Orinoco project
    April 24, 2013
    Taking a road and rail link across one of the biggest rivers in South America, together with its swamps and flood plain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shape with the Venezuelan government investing in the showcase project at Caicara del Orinoco. The bridge will have an overall length of 11.125km on completion, which is scheduled for 2015. The main bridge is 2.28km long, and the roadway is 55m above
  • Vacuworx offers the HL Series Hydraulic Barrier Lifters
    May 22, 2018
    Highway construction projects can be particularly challenging when space is limited, roads are crowded and time is short. To meet these challenges, the US company Vacuworx has developed the HL Series Hydraulic Barrier Lifters. Vacuworx describes the lifters as “a smarter way to handle concrete barriers”. The traditional method of moving concrete road barriers with slings and chains is slow and lacks control, not to mention increasing the dangers of accidents for employees. Designed for use with a variety
  • Indian construction equipment event in Mumbai
    August 7, 2012
    The organisers of the bC India 2013 construction equipment exhibition report strong bookings for the event, which is scheduled for 5th-8th February 2013 in Mumbai. The second edition of this event, it is expected to host 700 exhibitors and attract over 30,000 visitors. The show will occupy 130,000m2 of exhibition space at the Bandra Kurla Complex, an increase from the 88,000m2 occupied during the last fair.
  • Cut and cover consolidation
    July 10, 2012
    Foundation specialist Forasol has developed an innovative technique for anchor drilling that is improving ground consolidation on road projects in Switzerland. The technique has been widely used on a number of highway projects in the country, including construction of a new 1.3km long cut-and-cover trench for the A9 highway in south western Switzerland.