Skip to main content

Mott MacDonald’s passage to India

Mott MacDonald has been appointed design consultant for the proposed Raipur-Bilaspur national highway 200 in India. Part of the National Highways Development Programme Phase IV established by the National Highways Authority of India (NHAI), the new road will connect Raipur in Chhatttisgarh to Chandikohole in Orissa, passing through areas including Bilaspur, Raigarh and Jarsuguda. Costing US$244.2million, the 127km long road is primarily made up of four lanes, with 34km of the highway comprising six lanes. T
April 24, 2012 Read time: 2 mins
2579 Mott MacDonald has been appointed design consultant for the proposed Raipur-Bilaspur national highway 200 in India.

Part of the National Highways Development Programme Phase IV established by the 292 National Highways Authority of India (NHAI), the new road will connect Raipur in Chhatttisgarh to Chandikohole in Orissa, passing through areas including Bilaspur, Raigarh and Jarsuguda.

Costing US$244.2million, the 127km long road is primarily made up of four lanes, with 34km of the highway comprising six lanes. The works will include design of four major and 19 minor bridges, a railway over-bridge, three flyovers, 22 vehicular and nine pedestrian underpasses, 172 culverts, 18 major junctions, 15 bus bays, two truck lay-bys, three toll plazas and 25km of retaining walls.

Appointed by 1318 IVRCL Raipur-Bilaspur Tollways, Mott MacDonald will be responsible for the engineering and detailed design of the project, which will facilitate transport of raw materials like iron ore, limestone, dolomite, bauxite and coal to core industries thriving in the region. The stretch will also improve connectivity of industrially developing areas like Bilaspur, Raigarh and Jarsuguda.

Commenting on securing the design consultancy for national highway 200 Srinivasa Chari, Mott MacDonald’s project director, said: “With proven experience in managing major transport projects, we are uniquely placed to deliver this strategic highway and in particular are looking forward to the challenges of designing the new 550m long two lane bridge over the River Sivnath.”

Mott MacDonald has successfully completed bridge projects for IVRCL in the past. The project is due for completion in July 2014.

For more information on companies in this article

Related Content

  • Bangladesh: Cost of Padma Bridge project rises
    January 11, 2016
    The cost of building the Padma Bridge in Bangladesh will be nearly three times the US$2.61 billion estimated in 2011. Also on the rise is the cost of flood prevention work in the form of levee construction – called river training in Bangladesh. The addition of 1.3km of work at the Mawa end of the bridge means the total cost is now $1.2 billion, up from $1.1 billion. Apart from $200 from the $1 billion loan from India the project is not using any foreign financing, according to a report in the Daily S
  • Jaipur ring road construction starts
    March 11, 2019
    Construction work is now underway for the Jaipur Outer Ring Road project in Rajasthan in India.
  • VIDEO: Dualling of UK’s A1 approved, finally
    June 10, 2024
    Costain was appointed main contractor in 2021 and expected to start on the project in mid-2022.
  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.