Skip to main content

Mott Macdonald handling major Hong Kong project

Engineering firm Mott MacDonald has been commissioned to head the team designing the Hong Kong-Zhuhai-Macau Bridge link road. The Dragages-China Harbour-VSL joint venture appointed Mott MacDonald as lead designer for the 9.4km long viaduct section of the Hong Kong-Zhuhai-Macau Bridge. This US$1.66 (HK$12.9 billion) project is the largest single design and build contract ever awarded in Hong Kong. The bridge will carry a dual three-lane carriageway over the Pearl River Estuary, which is one of the world’s bu
July 24, 2012 Read time: 2 mins
Engineering firm 2579 Mott MacDonald has been commissioned to head the team designing the Hong Kong-Zhuhai-Macau Bridge link road. The Dragages-China Harbour-VSL joint venture appointed Mott MacDonald as lead designer for the 9.4km long viaduct section of the Hong Kong-Zhuhai-Macau Bridge. This US$1.66 (HK$12.9 billion) project is the largest single design and build contract ever awarded in Hong Kong. The bridge will carry a dual three-lane carriageway over the Pearl River Estuary, which is one of the world’s busiest shipping channels. The bridge will be constructed using the balanced cantilever method and will be formed from pre-stressed concrete box sections. Mott MacDonald is to design a substantial section of the viaduct, as well as being responsible overall for geotechnical, highways, electrical and mechanical, utilities, and other civil engineering services. Dr Mark Swales, Mott MacDonald’s transport division manager in Hong Kong said, “The project will enable us to showcase and draw upon our world-wide experience in the design of major bridges; it will be both challenging and rewarding for all.”

For more information on companies in this article

Related Content

  • Progress delayed on Kenya's vital highway link
    February 16, 2012
    Kenya is investing in road developments , reports Shem Oirere. A multi-million dollar highway expansion project in Kenya's capital Nairobi may now be delayed for close to a year because of a huge underground network of water, electricity and communication pipes and cables that has slowed down construction works.
  • Czech D35 section deal for Mott MacDonald
    April 23, 2024
    PricewaterhouseCoopers, Mott MacDonald, White & Case and SIEBERT + TALAŠ are part of the winning consortium for the Mohelnice-Opatovec stretch.
  • The doors open on a record-breaking bauma China 2018
    November 22, 2018
    You can tell a lot from numbers – and this year’s bauma China exhibition is set to be a record-breaker! The exhibitor numbers represent an impressive 11% increase on the 2,958 exhibitors from 41 countries that presented their products and innovations to around 170,000 visitors at the 2016 event.
  • State-of-the art road tunnels in construction and use of ITS
    April 25, 2013
    A wealth of major road tunnel construction projects and significant cant ITS installations within existing key road tunnels have been recently completed or will soon be underway. Guy Woodford examines some of them. A state-of-the art Tunnel Boring Machine (TBM) - the 10th largest ever to be built worldwide will be put to work later this year on New Zealand Transport Agency’s landmark Waterview Connection project in Auckland. The giant Herrenknecht-manufactured machine will be used to construct the twin 2.5