Skip to main content

Mott Macdonald handling major Hong Kong project

Engineering firm Mott MacDonald has been commissioned to head the team designing the Hong Kong-Zhuhai-Macau Bridge link road. The Dragages-China Harbour-VSL joint venture appointed Mott MacDonald as lead designer for the 9.4km long viaduct section of the Hong Kong-Zhuhai-Macau Bridge. This US$1.66 (HK$12.9 billion) project is the largest single design and build contract ever awarded in Hong Kong. The bridge will carry a dual three-lane carriageway over the Pearl River Estuary, which is one of the world’s bu
July 24, 2012 Read time: 2 mins
Engineering firm 2579 Mott MacDonald has been commissioned to head the team designing the Hong Kong-Zhuhai-Macau Bridge link road. The Dragages-China Harbour-VSL joint venture appointed Mott MacDonald as lead designer for the 9.4km long viaduct section of the Hong Kong-Zhuhai-Macau Bridge. This US$1.66 (HK$12.9 billion) project is the largest single design and build contract ever awarded in Hong Kong. The bridge will carry a dual three-lane carriageway over the Pearl River Estuary, which is one of the world’s busiest shipping channels. The bridge will be constructed using the balanced cantilever method and will be formed from pre-stressed concrete box sections. Mott MacDonald is to design a substantial section of the viaduct, as well as being responsible overall for geotechnical, highways, electrical and mechanical, utilities, and other civil engineering services. Dr Mark Swales, Mott MacDonald’s transport division manager in Hong Kong said, “The project will enable us to showcase and draw upon our world-wide experience in the design of major bridges; it will be both challenging and rewarding for all.”

For more information on companies in this article

Related Content

  • RMD Kwikform 3D viaduct design aids single concrete pour in Norway
    March 13, 2015
    Engineers with RMD Kwikform used 3D modelling to overcome challenging terrain and tight schedules for pouring a single-deck concrete viaduct in mid-Norway. The Doro Viaduct is a post-tension three-span single-carriageway measuring 9.5m wide. It forms an important part of the large realignment of the E39 Harangen-Høgkjølen route in the Trondheim mid-region of Norway. The project needed a formwork and shoring solution to support a 93m-long, 750m3 single-deck pour for the three span Doro viaduct in Norway. For
  • RMD Kwikform 3D viaduct design aids single concrete pour in Norway
    March 13, 2015
    Engineers with RMD Kwikform used 3D modelling to overcome challenging terrain and tight schedules for pouring a single-deck concrete viaduct in mid-Norway. The Doro Viaduct is a post-tension three-span single-carriageway measuring 9.5m wide. It forms an important part of the large realignment of the E39 Harangen-Høgkjølen route in the Trondheim mid-region of Norway. The project needed a formwork and shoring solution to support a 93m-long, 750m3 single-deck pour for the three span Doro viaduct in Norway. For
  • Hong Kong boundary crossing facility
    November 7, 2018
    A new Hong Kong Boundary Crossing Facilities (HKBCF) project has been built that will reduce travel times for drivers. The HKBCF is intended as a clearance facility for vehicles that either leave or enter Hong Kong across the new Hong Kong-Zhuhai-Macao Bridge (HZMB). In addition, the HKBCF is intended to operate as a strategic multi-modal transportation hub located on the west of Hong Kong. Construction of the HKBCF has involved reclaiming some 130ha of land from the water to the North East of Hong Kong
  • Jacobs Engineering Group wins contract to upgrade Scotland’s A9 highway
    October 3, 2014
    Jacobs Engineering Group has won the contract to upgrade Scotland’s A9 highway which runs from central Scotland to the far north coast, converting the route into a dual carriageway between Perth and Inverness, one of the busiest sections of the route. Jacobs said that the deal will be “one of the largest road infrastructure projects in Scotland’s history.” This is the second of three design contracts awarded for the project; and it covers 44km of the route including 3km of existing dual carriageway betwee