Skip to main content

Mott MacDonald Grontmij is handling key improvement scheme in UK

The Mott MacDonald Grontmij joint venture is working on plans for a € 189 million (£160 million) upgrade of the A63 Castle Street in the UK city of Hull. The partners were appointed by the Highways Agency to develop proposals for the scheme, which is intended to reduce journey times to the Port of Hull, ease congestion and improve safety on the city centre section of the A63. The route is currently one of the busiest sections of road in East Yorkshire. This 1.5km dual carriageway runs in an east-west direct
May 16, 2013 Read time: 2 mins
The 2579 Mott MacDonald Grontmij joint venture is working on plans for a € 189 million (£160 million) upgrade of the A63 Castle Street in the UK city of Hull. The partners were appointed by the 2309 Highways Agency to develop proposals for the scheme, which is intended to reduce journey times to the Port of Hull, ease congestion and improve safety on the city centre section of the A63. The route is currently one of the busiest sections of road in East Yorkshire. This 1.5km dual carriageway runs in an east-west direction to the south of Hull city centre and connects the M62 motorway, Humber Bridge and Port of Hull. Proposed improvements include lowering the level of the road into a cutting, widening the existing eastbound carriageway and building footbridges. The partners will develop cost, preliminary design, construction and related environmental proposals to support the planning process for construction of the scheme. This package of work has been awarded as part of the Highways Agency’s Project Support Framework - Lot 1, Integrated Highway Engineering and Technology Design Consultancy, for which the partners started working in April 2011.

For more information on companies in this article

Related Content

  • Carillion wins UK M6 managed motorway contract
    May 3, 2012
    Carillion has been awarded a US$16 million contract to transform another section of the UK’s M6 in Birmingham, between Junctions 5 and 8, into a managed motorway.
  • Carillion wins UK M6 managed motorway contract
    March 22, 2012
    Carillion has been awarded a US$16 million contract to transform another section of the UK’s M6 in Birmingham, between Junctions 5 and 8, into a managed motorway.
  • Clever electric solution for embankment stabilisation
    August 28, 2013
    A highly innovative solution for road embankment stabilisation has helped save costs by up to 30% over conventional techniques. Balfour Beatty Mott MacDonald has used electrical current to stabilise embankments on a busy UK dual carriageway, avoiding disruption to motorists, cutting carbon by 40% and costs by 30%, and producing zero waste When slope failure was detected on embankments carrying the popular A21 dual carriageway, Balfour Beatty Mott MacDonald pioneered a novel technique to tackle the prob
  • £355 million Hull road project delayed
    December 23, 2024
    A £355 million road project for the UK city of Hull road has been delayed.