Skip to main content

Motorcycle type approval deal for Europe

The Members of the European Parliament have now approved the regulation on the approval of two- and three wheelers. This included a number of amendments which have been welcomed by motorcyclists as a compromise. The regulation is setting new rules and technical requirements for manufacturers who sell motorcycles in the European Union. The new rules were intended to improve safety for motorcyclists but in the original form, these would have been expensive to implement and would have resulted in substantial c
November 29, 2012 Read time: 4 mins

The Members of the European Parliament have now approved the regulation on the approval of two- and three wheelers. This included a number of amendments which have been welcomed by motorcyclists as a compromise. The regulation is setting new rules and technical requirements for manufacturers who sell motorcycles in the 1116 European Union. The new rules were intended to improve safety for motorcyclists but in the original form, these would have been expensive to implement and would have resulted in substantial cost increases for motorcycles. The safety benefits themselves are still open to question however and how many lives will be saved remains a mystery, as there has been no clear research suggesting the changes will make anything but a tiny reduction in crashes.

This move follows two years of discussions and the European Parliament has approved the regulation on the approval and market surveillance of two- or three-wheel vehicles and quadricycles. As from 2016 member states of the EU will no longer have the option to restrict the maximum power output of motorcycles to 74 kW. New motorcycles with an engine capacity exceeding 125cm³will have to be equipped with anti-lock braking systems (ABS) while light motorcycles with capacities of 51-125cm³ will have to have at least combined braking systems (CBS). Measures to prevent tampering of the powertrain are going to be installed on all new powered two wheelers with a performance of up to 35kW. The riders organisations represented by 2906 Fema successfully managed to exclude A3 motorcycles and sidecars from these measures. Similarly, special schemes for the approval of individually built motorcycles remain in place which means that the possibility to exempt custom motorcycles from some of the strict measures of this regulation remains.

Emissions limits for motorcycles will become stricter in two stages. FEMA had called for high durability requirements to guarantee that emissions remain on a low level throughout the lifetime of the vehicle. The European Parliament has now decided that manufacturers will need to prove the durability of pollution control devices when driven for at least 35,000km. In order to increase competition and to help especially small and independent workshops manufacturers will have to provide easy and unrestricted access to maintenance and repair information for their products. At the same time access ports to on-board diagnostic systems, whose installation will also be required as from 2016 for new motorcycles, are going to be standardised. 

Contractors worried about public procurement practice in Poland. "We have never ever heard such outspoken criticism about procurement practice and contracting authorities in a single country by so many contractors from so many different enterprises and countries" says Ulrich Paetzold, Director General of FIEC, the 6164 European Construction Industry Federation coming out of a meeting organized in Brussels on 21/11/2012. "And all of these companies have decades of worldwide experience with public procurement and FIDIC standard forms of contract," adds Frank Kehlenbach, Director of EIC, the European International Contractors, on the same occasion, "but this experience does not help them in Poland, given the reluctance of public clients to perform their part of the job."

Contractors active in public works contracts in Poland are profoundly worried about the severe deterioration of public procurement rules and practice over the last years. In fact, for some time already, various changes of both the Public Procurement Law and the internationally recognised FIDIC contract conditions have led to a situation which is being considered as grossly unfair, counter-productive and unacceptable by the contractors.

The combination of poorly prepared tenders, a generally unfair attitude towards contractors and the non-respect of contractual obligations by public clients not only raises the question of professionalism on the demand side but also leads to a number of concerns regarding Internal Market issues, such as lack of transparency and proportionality, as well as discrimination and freedom to provide services. If this development cannot be stopped and reversed, then there is real danger that this inefficiency in spending European funds, will lead the EU to reviewing its funding and lending policies which have provided Poland with almost 68 billion € in the current period and which are in legislative procedures at this very moment.

FIEC and EIC, with its partners in Poland, would like to contribute constructively to avoiding a further deterioration of the situation which would have dramatic consequences not only for Polish contractors, but also for Poland as such, a country whose achievements in the European Union so far have to be applauded.

It is also interesting to note that currently at least 2 billion € are "blocked" by litigation in front of Polish courts and that this amount is rapidly increasing.

For more information on companies in this article

Related Content

  • Fehmarn Belt Fixed Link could open by 2025 at earliest
    November 27, 2015
    The ambitious Fehmarn Belt Fixed Link, connecting Denmark and Germany, will open in 2025 at the earliest, according to the Danish finance ministry. Femern A/S, the Danish government-owned company managing the project, confirmed the note from the government. It also said the ministry still has financial concerns over the deal to build an immersed tunnel connecting the towns of Rødby in Denmark’s southern Zealand with Puttgarden in northern Germany. Of particular is the time for a construction company t
  • Tyne tunnel's water quality checks
    February 6, 2012
    Five buoy-mounted automatic water quality monitors (AWQMs) have been installed by YSI Hydrodata engineers at the new Tyne Tunnel project in north-east England. The equipment on the second vehicle tunnel under the River Tyne, currently one of the UK's largest construction projects, aims to ensure that construction operations do not significantly affect river water quality. Unusually, the contractors have not taken ownership of the instrumentation, preferring instead to simply purchase the data and alarms. Th
  • UK universities' research shows potholes can be fixed better
    February 14, 2013
    Academic research by two UK universities shows that patch repairs on potholes could be far more durable if a few simple techniques were consistently used. An initial study - undertaken by Nottingham Trent University and the University of Nottingham in central England– found that the application of a coat of bitumen emulsion between two layers of asphalt in a clean, dry repair, greatly improved its resistance to further cracks. It was also confirmed that a hot mix repair – in which asphalt is heated to 140°C
  • New barrier, crash cushion and access control technology will benefit road user safety
    October 26, 2012
    Protecting road users, with barriers, crash cushions or access control systems, is crucial for network safety - Mike Woof writes Tough regulations are now in place in Europe and the US, requiring road authorities to provide safer road infrastructure than in the past. Technologies to reduce the severity of vehicle impacts against obstructions or redirect vehicles into the roadway should help cut injuries amongst drivers and passengers alike. The specifications for the use of crash cushions and barriers can v