Skip to main content

Moscow's new link

Moscow's new Zvenigorodskoye Highway arterial road project should be complete by September 2012.
February 24, 2012 Read time: 1 min
Moscow's new Zvenigorodskoye Highway arterial road project should be complete by September 2012. The route provides a link to Moscow's business centre and will have three lanes in each direction. , reports Andrey Bochkarev, the head of the Moscow Construction Department. The project also includes the construction of five pedestrian underpasses along the existing Tretya Magistralnaya Street. Some US$344.6 million has already been invested in the project.

Related Content

  • Highway work boost in North Africa
    August 21, 2012
    North Africa is seeing construction business return - Mike Woof reports After a troubled period, stability looks to be returning to North African nations, which can only be good for the road construction sector. First Tunisia, then Egypt and finally Libya saw tumultuous revolts against the previous autocratic (and in one case at least, despotic) rulers. All three nations are now benefiting from a return to stability, with economic growth also improving once more.
  • Texas highway construction project underway
    January 4, 2024
    A US$414 million Texas highway construction project is now underway.
  • Major US highway includes 76-year toll deal
    December 4, 2012
    Work on an extension to the express lanes on the I-95 Interstate highway in the US will be carried by Fluor Enterprises and the Transurban Group. The two companies have a 76-year concession package to operate and maintain the toll road infrastructure for the section of I-95 under a joint venture arrangement, 95 Express, The 147km stretch of express lanes on the I-95 highway will be owned by The Virginia Department of Transportation (VDOT) however. Work on the US$925 million project is commencing in Septembe
  • Key highway concession in US
    August 9, 2012
    Work on an extension to the express lanes on the I-95 Interstate highway in the US will be carried by Fluor Enterprises and the Transurban Group. The two companies have a 76 year concession package to operate and maintain the toll road infrastructure for the section of I-95 under a joint venture arrangement, 95 Express, The 147km stretch of express lanes on the I-95 highway will be owned by The Virginia Department of Transportation (VDOT) however.