Skip to main content

More efficient ground stabilisation with the Allu 3D Positioning System

The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in
April 19, 2013 Read time: 2 mins
Allu 3D Positioning System aims to increase the efficiency and reduce the cost of ground stabilisation works
The 2180 ALLU 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer.

The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit.

Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in powder form via a hose to the mixing head where it is churned into the soil.

The Allu 3D Positioning System tells the driver where to position the mixing head and, when the area of ground being stabilised is complete, it tells the driver to change location. “This eases the mixing work and at the same time ensures homogenous mixing results and accurate binder feeding on each cell,” said Allu.

The advantage for the contractor is that it makes binder use more efficient, saving money, and also saving time. The system also records the ground stabilisation information for each cell, information which can be transferred via a memory stick and used by the contractor for reporting and planning.

Stand: FGN.N718/2

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 48325 0 oLinkExternal www.Allu.net http://www.allu.net/ false /EasySiteWeb/GatewayLink.aspx?alId=48325 false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • CTE’s European lift off
    March 27, 2013
    Since signing an exclusive licensing agreement with Genie Industries in 1987, CTE has become one of the largest European groups in the field of lifting and movement of materials. Founded in 1981, the company now has a commercial presence covering all five world continents.
  • Fuller EmiControls on emissions
    March 27, 2013
    EmiControls new large turbine – the V22 – will be showcased at bauma 2013. The company, which began trading independently in 2012, offers mobile and stationary solutions for optimum dust emission control during demolition, recycling plant, quarry, mining and industrial-based applications.
  • Ormet’s experienced lifting and handling solutions
    April 8, 2013
    The Ormet Group has an impressive 40 years of experience in the world of lift and handling. One of its divisions, Jekko, manufactures high quality self-propelled crawler minicranes, minipickers and vacuum technology. Overmat, another Ormet Group division, manufactures high quality automatic self-propelled mixers for construction and other equipment for handling and logistics of the modern construction site.
  • LTM1750-9.1 all-terrain crane joins Liebherr line-up
    January 6, 2017
    Liebherr has developed the LTM1750-9.1, a nine-axle all-terrain crane with a maximum lift capacity of 750 tonnes. The 52m telescopic boom machine is carried by the machine and offers a 154m maximum lift height, with a maximum working radius of 112m. A luffing fly jib can be added in 3.5m increments to take maximum lift height to 91m. Weighing in at 108 tonnes in transport configuration, the LTM puts down 12 tonnes per axle. However if the machine’s boom supports are removed the crane can travel at 11 tonnes