Skip to main content

More efficient ground stabilisation with the Allu 3D Positioning System

The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in
April 19, 2013 Read time: 2 mins
Allu 3D Positioning System aims to increase the efficiency and reduce the cost of ground stabilisation works
The 2180 ALLU 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer.

The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit.

Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in powder form via a hose to the mixing head where it is churned into the soil.

The Allu 3D Positioning System tells the driver where to position the mixing head and, when the area of ground being stabilised is complete, it tells the driver to change location. “This eases the mixing work and at the same time ensures homogenous mixing results and accurate binder feeding on each cell,” said Allu.

The advantage for the contractor is that it makes binder use more efficient, saving money, and also saving time. The system also records the ground stabilisation information for each cell, information which can be transferred via a memory stick and used by the contractor for reporting and planning.

Stand: FGN.N718/2

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 48325 0 oLinkExternal www.Allu.net http://www.allu.net/ false /EasySiteWeb/GatewayLink.aspx?alId=48325 false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • CTE holds dealer training at bauma
    January 6, 2017
    CTE held a successful dealer training session at bauma, aimed particularly at sharing product information including its new Zed truck-mounted articulated platforms’ variable jacking system. Other key areas of focus included the new Traccess models – which are almost ready to be presented to the market. CTE dealers were present from Russia, Slovakia, the Czech Republic, Serbia, France, England, Germany, Switzerland, Holland, Denmark, Belgium, Australia, China and the Middle East.
  • CTE holds dealer training at bauma
    April 19, 2013
    CTE held a successful dealer training session at bauma, aimed particularly at sharing product information including its new Zed truck-mounted articulated platforms’ variable jacking system. Other key areas of focus included the new Traccess models – which are almost ready to be presented to the market. CTE dealers were present from Russia, Slovakia, the Czech Republic, Serbia, France, England, Germany, Switzerland, Holland, Denmark, Belgium, Australia, China and the Middle East.
  • First public outing for Liebherr tower crane at INTERMAT
    January 6, 2017
    Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane. The 380tonne unit tops the 15-model range, which starts from 50tonnes. The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.
  • First public outing for Liebherr tower crane at INTERMAT
    April 20, 2012
    Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane. The 380tonne unit tops the 15-model range, which starts from 50tonnes. The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.