Skip to main content

More efficient ground stabilisation with the Allu 3D Positioning System

The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in
April 19, 2013 Read time: 2 mins
Allu 3D Positioning System aims to increase the efficiency and reduce the cost of ground stabilisation works
The 2180 ALLU 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer.

The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit.

Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in powder form via a hose to the mixing head where it is churned into the soil.

The Allu 3D Positioning System tells the driver where to position the mixing head and, when the area of ground being stabilised is complete, it tells the driver to change location. “This eases the mixing work and at the same time ensures homogenous mixing results and accurate binder feeding on each cell,” said Allu.

The advantage for the contractor is that it makes binder use more efficient, saving money, and also saving time. The system also records the ground stabilisation information for each cell, information which can be transferred via a memory stick and used by the contractor for reporting and planning.

Stand: FGN.N718/2

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 48325 0 oLinkExternal www.Allu.net http://www.allu.net/ false /EasySiteWeb/GatewayLink.aspx?alId=48325 false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Hidromek has developed a long reach excavator
    February 6, 2013
    A new version of Hidromek’s well accepted HMK220LC excavator is being offered with a long reach boom for use in special earthmoving and drainage applications. Called the HMK200LC LR, this machine is designed for fine grading at long reach, as well as for duties such as ditching and drainage clearance. As with the standard machines, Tier 4 Interim/Stage IIIB emission certified engine and hydraulics components are used. According to export manager Anil Bingöl, this machine widens Hidromek’s standard excavator
  • Fayat Group to acquire Terex Roadbuilding assets
    January 6, 2017
    The Fayat Group intends to buy a number of assets from CMI Terex from its road building operations. The purchase agreement covers acquisition of certain product lines in North America, and the road building operations of Terex in Brazil. This deal will be a significant breakthrough for Fayat’s road machinery subsidiary BOMAG as well as the mixing plant business unit operations Marini Ermont. “The addition of these product lines enhances the position of the Fayat Group as the only full liner in road building
  • Fayat Group to acquire Terex Roadbuilding assets
    February 11, 2013
    The Fayat Group intends to buy a number of assets from CMI Terex from its road building operations. The purchase agreement covers acquisition of certain product lines in North America, and the road building operations of Terex in Brazil. This deal will be a significant breakthrough for Fayat’s road machinery subsidiary BOMAG as well as the mixing plant business unit operations Marini Ermont. “The addition of these product lines enhances the position of the Fayat Group as the only full liner in road building
  • Wassara offers water drilling option
    January 6, 2017
    Innovative water-powered drilling technology developed in Sweden is claimed to drill straighter and deeper than conventional systems. Said to be environmentally friendly, the Wassara drilling technology has been developed and perfected over 20 years by Swedish iron ore producer LKAB. Using the Wassara drills has allowed LKAB to drastically cut operating costs. A complete range is now offered and suits applications within ground engineering, dam rehabilitation and exploration drilling. The heart in the syste