Skip to main content

More efficient ground stabilisation with the Allu 3D Positioning System

The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in
April 19, 2013 Read time: 2 mins
Allu 3D Positioning System aims to increase the efficiency and reduce the cost of ground stabilisation works
The 2180 ALLU 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer.

The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit.

Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in powder form via a hose to the mixing head where it is churned into the soil.

The Allu 3D Positioning System tells the driver where to position the mixing head and, when the area of ground being stabilised is complete, it tells the driver to change location. “This eases the mixing work and at the same time ensures homogenous mixing results and accurate binder feeding on each cell,” said Allu.

The advantage for the contractor is that it makes binder use more efficient, saving money, and also saving time. The system also records the ground stabilisation information for each cell, information which can be transferred via a memory stick and used by the contractor for reporting and planning.

Stand: FGN.N718/2

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 48325 0 oLinkExternal www.Allu.net http://www.allu.net/ false /EasySiteWeb/GatewayLink.aspx?alId=48325 false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Lombardini boosts KDi engine output towards 100kW
    January 6, 2017
    Lombardini is moving ever closer to offering a 100kW engine as part of its strategy to grow the Kohler KDi series above the 56kW maximum output that currently sits at the top of its range. “We have developed a 3.4litre, four-cylinder engine that will take us to 100kW,” said Lombardini’s marketing and communications manager Nino De Giglio. “The engine is currently being tested and will go into production towards the end of 2014.” De Giglio said the arrival of the new 100kW engine, with its 480Nm of torque, c
  • Lombardini boosts KDi engine output towards 100kW
    April 18, 2013
    Lombardini is moving ever closer to offering a 100kW engine as part of its strategy to grow the Kohler KDi series above the 56kW maximum output that currently sits at the top of its range. “We have developed a 3.4litre, four-cylinder engine that will take us to 100kW,” said Lombardini’s marketing and communications manager Nino De Giglio. “The engine is currently being tested and will go into production towards the end of 2014.” De Giglio said the arrival of the new 100kW engine, with its 480Nm of torque, c
  • Herrenkencht has developed a novel pipeline installation package
    January 6, 2017
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
  • Herrenkencht has developed a novel pipeline installation package
    February 6, 2013
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the