Skip to main content

Montabert extends low-cost breaker offering

Breaker specialist Montabert has increased its budget offering with a new two-speed unit and additions to its Blue Line. By restricting the speed choice to two, the new V3500 breaker (suitable for carriers from 35 to 60tonnes) is around 20% cheaper than its full-spec multi-speed counterpart while still allowing the machine operator the choice between maximum speed and maximum impact power. The company’s Blue Line, described as a simple breaker design, has been extended at the light end of the range by the a
January 6, 2017 Read time: 2 mins
Marketing Director Alain Carbonnel shows off the Blue Line breakers from Montabert
RSSBreaker specialist 2396 Montabert has increased its budget offering with a new two-speed unit and additions to its Blue Line.

By restricting the speed choice to two, the new V3500 breaker (suitable for carriers from 35 to 60tonnes) is around 20% cheaper than its full-spec multi-speed counterpart while still allowing the machine operator the choice between maximum speed and maximum impact power.

The company’s Blue Line, described as a simple breaker design, has been extended at the light end of the range by the addition of the XL1000 and XL1300, which suit 11 to 17tonne and 15 to 22 tonne carriers respectively.

They use 107mm and 124mm tools to deliver 2000 and 2700Joules of blow energy and Montabert said the new units retain its build quality but are around half the cost of the full spec breaker.

www.montabert.fr

Hall: 6 Stand: G090

RSS
View more stories
View more videos

For more information on companies in this article

Related Content

  • Doosan launches branding scheme
    March 9, 2012
    Doosan Portable Power, who will be exhibiting at Intermat 2012, has introduced a new branding scheme for the company’s leading ranges of portable air compressors, generators and lighting towers.
  • Terex launches fully hydraulic self-erecting tower crane
    April 18, 2012
    Terex Cranes introduced the Eazy 90 fully-hydraulic self-erecting tower crane at INTERMAT. Equipped with a maximum 45m jib, the crane has a telescopic main tower with up to three additional mast sections. Erection can be carried out by two people in 2-4 hours depending on specification. The crane is equipped with safety lock-outs to ensure that each stage of erection has been completed before progressing to the next. A single operator is required to work the crane, with the Eazy 90 offering a maximum li
  • Furukawa Rock Drill extends FXJ breaker series
    March 11, 2016
    Furukawa Rock Drill (FRD) is increasing the performance of its FXJ hydraulic breakers. The firm has increased the power to weight ration due to continuous developments of the FRD Inliner-Systems and various patented solutions. Weight has been reduced breaker while the units offer higher impact energy results for a greater breaking power. From 2016 the FXJ is available in six models for excavators from 9-75tonnes, including two new models, the FXJ125 and FXJ770. The FXJ125, for excavators from 9-16tonn
  • Furukawa Rock Drill extends FXJ breaker series
    January 6, 2017
    Furukawa Rock Drill (FRD) is increasing the performance of its FXJ hydraulic breakers. The firm has increased the power to weight ration due to continuous developments of the FRD Inliner-Systems and various patented solutions. Weight has been reduced breaker while the units offer higher impact energy results for a greater breaking power. From 2016 the FXJ is available in six models for excavators from 9-75tonnes, including two new models, the FXJ125 and FXJ770. The FXJ125, for excavators from 9-16tonn