Skip to main content

MOBA launches two-in-one compact machine control system

Three-dimensional technology is playing an increasingly important role on construction sites around the world but there are still projects for which there is no 3D data and the use of a 2D system makes more sense for machine control. With the new 3D-matic, MOBA offers a precise and flexible 3D levelling system for graders, dozers and blades that can also be used as a 2D system if necessary. MOBA 3D-matic increases efficiency in machine use and contributes to fast and precise project execution. The compact t
April 15, 2013 Read time: 2 mins
MOBA’s Bernhard Marx demonstrates the new MOBA 3D-matic system
Three-dimensional technology is playing an increasingly important role on construction sites around the world but there are still projects for which there is no 3D data and the use of a 2D system makes more sense for machine control.

With the new 3D-matic, 1228 MOBA offers a precise and flexible 3D levelling system for graders, dozers and blades that can also be used as a 2D system if necessary.

MOBA 3D-matic increases efficiency in machine use and contributes to fast and precise project execution. The compact two-in-one controller combines 2D and 3D computers in a single housing, so depending on the project, the operator can work with 3D or 2D.

The 3D planning data is made available to the system via a data carrier. The position of the machine is ascertained with the GNSS sensor or, alternatively, a total station. The controller compares the machine position with design data and calculates the deviations with any corrections for these deviations performed quickly and precisely in the blade controller. MOBA 3D-matic features a simple and straightforward menu navigation system in a clearly arranged touch-screen display. The rugged components are ideally suited for use on construction sites and can withstand environmental factors such as heat, cold, dust or moisture.

The modular structure of the MOBA systems makes possible problem-free upgrading of all MOBA 2D levelling systems to the 3D system.

Stand: A3.227/326

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 69175 0 oLinkExternal www.Moba.de www.Moba.de false /EasySiteWeb/GatewayLink.aspx?alId=69175 false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • An improved paving control system is available from MOBA
    February 8, 2013
    MOBA is aiming to improve paving quality and cut contractor’s costs with its sophisticated heat measuring package for asphalt pavers, as well as its new sonic ski system. Called the PAVE-IR, this heat measuring system provides accurate temperature scanning and monitoring of mat temperature during asphalt paving. This can be documented for an entire project and allow contractors to optimise processes and verify the quality of paving work. Marketing manager Christine Seidel said, “The early generation system
  • Leica Geosystems launches iCON for wheeled loaders
    January 6, 2017
    Leica Geosystems has unveiled its new powerful Leica iCON 3D machine control system for wheeled loaders. The Swiss firm says the system allows users to complete their earthworks jobs faster and correctly the first time. It is also said to precisely control material cut and fill, saving a lot of time and money by reducing rework and over-excavation, while also making grading operations with wheeled loaders more efficient. Grade checking, says Leica, can be eliminated, further enhancing productivity, efficien
  • Leica Geosystems launches iCON for wheeled loaders
    April 19, 2013
    Leica Geosystems has unveiled its new powerful Leica iCON 3D machine control system for wheeled loaders. The Swiss firm says the system allows users to complete their earthworks jobs faster and correctly the first time. It is also said to precisely control material cut and fill, saving a lot of time and money by reducing rework and over-excavation, while also making grading operations with wheeled loaders more efficient. Grade checking, says Leica, can be eliminated, further enhancing productivity, efficien
  • Trimble introduces grade control simulator for bulldozer operator training
    January 6, 2017
    Trimble used bauma 2013 to introduce a construction grade control simulator for the specific purpose of training bulldozer operators. The simulator enables Sitech Technology dealers to deliver training on the GCS900 grade control system in a safe and realistic environment, without removing a bulldozer from production duties to carry out operator training. Trimble’s grade control simulator features fully interactive joysticks, a motion platform, decelerator and CB460 control box, enabling bulldozer operators