Skip to main content

Moba division for Germany, Austria and Switzerland

Moba Mobile Automation, based in Limburg, Germany, has formed an earthmoving division concentrating on Germany, Austria and Switzerland. Moba develops and manufactures measurement and control technology, identification and weighing systems for construction machines and waste disposal vehicles. Andreas Velten, head of the division, said the move means Moba can provide optimal service and support at regional level, particularly for small and medium-sized construction companies and construction machinery deale
October 16, 2015 Read time: 1 min
1228 Moba Mobile Automation, based in Limburg, Germany, has formed an earthmoving division concentrating on Germany, Austria and Switzerland. Moba develops and manufactures measurement and control technology, identification and weighing systems for construction machines and waste disposal vehicles. Andreas Velten, head of the division, said the move means Moba can provide optimal service and support at regional level, particularly for small and medium-sized construction companies and construction machinery dealers. Many larger earthwork projects such as motorways and embankments are already planned and created digitally in 3D. For these particular tasks, Moba supplies 3D machine controllers for excavators, dozers and graders.

For more information on companies in this article

Related Content

  • New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Economy
    April 20, 2023
    The Bogor-Ciawi-Sukabumi (Bocimi) toll road is a series of national strategic projects to help reduce traffic congestion along the existing factory-lined roadway, as well as enhance regional connectivity and tourism in West Java. Spanning 54 kilometers, the new highway corridor is expected to shorten travel time between the Bogor and Sukabumi provinces from two hours to 30 minutes and boost economic conditions in the surrounding Sukabumi area. Construction is divided into four phases, the first of which measures 15.35 kilometers and is already complete. PT Waskita Karya (Waskita) is the main contractor for the IDR 2.1 trillion second section, spanning 11.9 kilometers between Cigombong and Cibadak, and set for completion in 2023 after being delayed due to the pandemic.
  • Houston Airport paving work for Dynapac
    May 23, 2022
    Equipment from Dynapac is playing an important role in improving facilities at Houston Airport. The firm´s TH E technology has been employed to deliver a surface to grade, with high levels of pre-compaction and also automation.
  • Bilbao benefits from major tunnel project
    February 10, 2012
    The northern Spanish city of Bilbao looks set to benefit from a major tunnel construction project aimed at reducing traffic congestion on its vehicle clogged streets. The city is building a new underground metro section, Line 3, which will help carry commuters to and from the city's commercial centre and help reduce vehicle journey times on the surface. This project is also making use of the latest piece of tunnelling equipment from Sandvik, the MT520 roadheader, a powerful machine designed and built at
  • CECE Summit – is Europe ready for a digital construction worksite?
    November 20, 2015
    The CECE has voiced his concern over government regulations that could strangle innovation for the digitalisation of construction machinery. China’s imploding economy was another topic at the recent conference in Brussels, reports David Arminas. The CECE has urged the European Parliament and European Commission to enact legislation that promotes rather than hinders the construction sector’s transition to a digitalised way of working. “We need a smart regulatory framework that helps to unlock the full poten