Skip to main content

MOBA develops innovative excavator control package

MOBA is now offering a sophisticated excavator control package that has been developed in partnership with Finnish firm Novatron. The package has been developed along modular lines and the firm’s marketing manager Christine Seidel said, “Once the sensors are installed in the excavator you can start off with the low cost system and upgraded it later.”
January 6, 2017 Read time: 2 mins
MOBA's sophisticated excavator control system
1228 MOBA is now offering a sophisticated excavator control package that has been developed in partnership with Finnish firm 734 Novatron. The package has been developed along modular lines and the firm’s marketing manager Christine Seidel said, “Once the sensors are installed in the excavator you can start off with the low cost system and upgraded it later.”

The basic package is a 2D system while a sophisticated 3D version with full function options is available. The simple Xsite EASY package can measures excavation depth, incline and range and displays all current values on the display in the vehicle cab. Using these parameters, the operator can control the bucket and accurately create the desired profile even in construction sites with limited visibility. The height monitor increases safety at the construction site, as the system warns the operator of impending contact with overhead lines. “It’s all sealed so you can also use it underwater,” Seidel said.

For more complex tasks the Xsite PRO package offers a wide range of 3D duties. Project data can be transmitted from the office to the system through the Internet connection and the system can use all common data formats. The GNSS positioning data is collected automatically and using a digital 3D terrain model, work can be monitored closely on the touch-screen panel. For positioning the machine, Xsite PRO only requires one GNSS sensor, while two GNSS sensors will provide machine orientation.

Stand: A3.227/326

 

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 69175 0 oLinkExternal www.moba.de www.moba.de false /EasySiteWeb/GatewayLink.aspx?alId=69175 false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • GCS Flex system is important introduction for Trimble
    April 17, 2013
    Roz Buick, vice president Heavy Civil Construction at Trimble, has highlighted some key technology introductions from the firm. The GCS Flex system is an important introduction for Trimble and Buick explained, “The idea is to install a less complex system. We want to attract customers from the smaller contractors.” Comparatively low cost for a machine-control system, the basic GCS Flex package offers entry-level 2D technology and it can be upgraded to what Buick calls a ‘2½D’ system.
  • Accurate load weighing system from Loadrite
    February 13, 2013
    The Loadrite L2150 wheeled loader bucket weighing system is said to offer increased accuracy and reliability. The system is said to ensure haul trucks can be loaded properly, improving overall productivity by ensuring operational efficiency. Using this weighing system trucks are neither under-loaded nor over-loaded, with the ensuing associated productivity losses and excess machine wear problems respectively, all but eliminated. Aimed at use in large quarry operations the new Loadrite L2150 unit is said to
  • Herrenkencht has developed a novel pipeline installation package
    January 6, 2017
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
  • Herrenkencht has developed a novel pipeline installation package
    February 6, 2013
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the