Skip to main content

MK spends US$171.38 million on Hungarian road upgrades in 2012

The Hungarian national road management firm Magyar Kozut (MK) began road upgrade projects worth US$ 171.38 million (HUF 38bn) in 2012. The upgraded highways covered a total length of 360km. Development projects were carried out in line with the country's Regional Development Operational Programme (ROP) as part of Hungary's New Szechenyi Plan (USZT). Meanwhile, it has also been revealed that around $496.78 million (HUF 110bn) has been allocated for road renovation works in total by the end of 2013.
January 4, 2013 Read time: 1 min
The Hungarian national road management firm 7071 Magyar Kozut (MK) began road upgrade projects worth US$ 171.38 million (HUF 38bn) in 2012. The upgraded highways covered a total length of 360km. Development projects were carried out in line with the country's Regional Development Operational Programme (ROP) as part of Hungary's New Szechenyi Plan (USZT).

Meanwhile, it has also been revealed that around $496.78 million (HUF 110bn) has been allocated for road renovation works in total by the end of 2013.

For more information on companies in this article

Related Content

  • Brazil opening tender processes for highways, tunnels and road repairs
    July 4, 2014
    A series of tenders for major highway, tunnel and road repair projects are being opened in Brazil. The country’s national transport infrastructure department, DNIT, has set out plans for a series of tenders, all of which form part of phase 2 of the country's growth acceleration plan, PAC. The first of the key projects opening for tender will be the new Morro dos Cavalos tunnel, which will be constructed in the southern state of Santa Catarina. This 1.36km tunnel will be built in the city of Palhoça and form
  • Economic gains from widening the A453 in Nottingham, England
    August 12, 2014
    Work is well underway on turning a busy just over 11km two-lane link road from the city of Nottingham to Junction 24 of the M1 in Leicestershire, England into a four-lane highway. The widened highway will relieve considerable peak-time congestion for travellers to Nottingham, the M1 and East Midlands Airport while also making journeys safer and more reliable. Guy Woodford reports Used by up to 30,000 vehicles a day, the A453 is renowned for congestion at peak travel times. But years of day-to-day commuter a
  • Zambia road surfacing upgrade
    February 8, 2018
    Work is starting on an upgrade for a 100km stretch of road in Zambia. The route connects Nchelenge and Chiengi districts and will benefit from a new asphalt surface. The project is costing US$77 million and is being carried out by the contractor Sinohydro Zambia. Delays to the work have been caused by heavy rains however. The Zambian Government has paid an initial $3.8 million for the work to be carried out and the project is expected to take two years to complete.
  • Sri Lankan highway upgrade
    February 29, 2012
    A key route in Sri Lanka is to see a major upgrade programme following provision of a US$100 million loan by the World Bank (WB).