Skip to main content

Mitsubishi tests emergency traffic light power using electric vehicle

Japanese manufacturer Mitsubishi Motors has aided in a pilot study using an electric vehicle to power traffic lights.
March 15, 2012 Read time: 1 min
Japanese manufacturer 3055 Mitsubishi Motors has aided in a pilot study using an electric vehicle to power traffic lights. The trial was carried out in partnership between Mitsubishi and the 2343 National Police Agency. The i-MiEV electric vehicle was modified so that it could be used as a power source for the traffic lights. The electric vehicle was attached to the traffic lights through charging equipment for electric currents. A total of 20 lights were powered for some 120 minutes. The initiative is aimed to prepare for a blackout in the event of a disaster that causes a failure of the electricity grid.

For more information on companies in this article

Related Content

  • Sweden to create permanent electric road
    January 26, 2022
    The road will be a 21km stretch of the E20 between Hallsberg and Örebro.
  • Swell times for swale construction with a Sidewinder
    October 9, 2018
    Specialised swale construction featured in Northern England recently UK contractor Balfour Beatty examined different methods for building swales along the Norwich Northern Distributor Road near the English city of Norwich. Balfour decided to trial specialised road-widening machines, specially configured excavator buckets and modified compaction equipment. Excavators and dump trucks prepared the area for placement of sub-base material. The swale areas were constructed using both conventional methods as wel
  • Volvo CE starts testing world's first prototype hydrogen articulated hauler
    June 14, 2022
    Volvo Construction Equipment (Volvo CE) has started testing of the world's first fuel cell articulated hauler prototype, the Volvo HX04.
  • Ground penetrating radar used to investigate tunnel deterioration
    May 13, 2015
    Using ground penetrating radar to determine reason for serious pavement settling in Kentucky-Tennessee tunnel Just a few years after the opening of the Cumberland Gap Tunnel, highway officials noticed moderate to severe settling of the continuously reinforced concrete pavement. The mountain tunnel provides an important link between Kentucky and Tennessee along US25E and the problem looked serious, with many voids discovered beneath the pavement surface. To investigate the problems, the Kentucky Transpor