Skip to main content

Missouri’s Blanchette Bridge gets smaller and smaller

Missouri’s Blanchette Bridge is now even more abridged. Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012. More than 2,000tonnes of steel dropped over 300m into the Missouri River. A 107m section of the Blanchette Bridge was brought down last month. The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.
December 10, 2012 Read time: 1 min
Missouri’s Blanchette Bridge is now even more abridged.

Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012.

As a result of the latest explosion over 300m of steel, weighing more than 2,000tonnes, dropped into the Missouri River.

A 107m section of the Blanchette Bridge was brought down last month.

The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The bridge that keeps getting smaller www.demolitionnews.com false http://www.demolitionnews.com/2012/12/04/video-the-bridge-that-keeps-getting-smaller/ false false%>

Related Content

  • ContiTech Conveyor Belt Group showcases MegaPipes solution
    February 26, 2013
    The ContiTech Conveyor Belt Group’s “innovative and environmentally friendly” conveyor belt solutions include the new MegaPipes. With an external diameter of up to 900mm, ContiTech claims the product doubles the capacities compared to conventional closed-trough belts and enables the transport of crushed ore downstream of the primary crusher or of bulky goods in the industrial sector applications.
  • Cummins meeting Stage IV/Tier 4 Final with extended range of engines
    January 6, 2017
    The Cummins Engine stand this year’s Bauma will be dominated by one of the largest engines at the show, alongside one of the smallest. The firm will show a 37kW (49hp) 2.8-litre QSF2.8 alongside its giant QSK95, which delivers 3,130kW (4,200hp). These two engine highlight extensions to both ends of the Cummins offering, one of the broadest in the industry that is capable of meeting the coming Stage IV/Tier 4 Final emissions legislation.
  • Cummins meeting Stage IV/Tier 4 Final with extended range of engines
    February 7, 2013
    The Cummins Engine stand this year’s Bauma will be dominated by one of the largest engines at the show, alongside one of the smallest. The firm will show a 37kW (49hp) 2.8-litre QSF2.8 alongside its giant QSK95, which delivers 3,130kW (4,200hp). These two engine highlight extensions to both ends of the Cummins offering, one of the broadest in the industry that is capable of meeting the coming Stage IV/Tier 4 Final emissions legislation.
  • Melbourne link: Hyder and Parsons Brinckerhoff to be design team
    October 22, 2014
    Hyder and Parsons Brinckerhoff have been appointed as the design team for the US$5.97 billion East West Link in Melbourne, Australia. The two engineering and management consultancies are in a 50/50 joint venture to provide detailed design and construction support services for the 6.6km Stage 1 work, which is the eastern section, of the project. Together with the proposed western section, the completed East West Link will cost around $7 billion. The toll road will form an 18km cross-city connection ext