Skip to main content

Missouri’s Blanchette Bridge gets smaller and smaller

Missouri’s Blanchette Bridge is now even more abridged. Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012. More than 2,000tonnes of steel dropped over 300m into the Missouri River. A 107m section of the Blanchette Bridge was brought down last month. The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.
December 10, 2012 Read time: 1 min
Missouri’s Blanchette Bridge is now even more abridged.

Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012.

As a result of the latest explosion over 300m of steel, weighing more than 2,000tonnes, dropped into the Missouri River.

A 107m section of the Blanchette Bridge was brought down last month.

The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The bridge that keeps getting smaller www.demolitionnews.com false http://www.demolitionnews.com/2012/12/04/video-the-bridge-that-keeps-getting-smaller/ false false%>

Related Content

  • Hidromek has developed a long reach excavator
    January 6, 2017
    A new version of Hidromek’s well accepted HMK220LC excavator is being offered with a long reach boom for use in special earthmoving and drainage applications. Called the HMK200LC LR, this machine is designed for fine grading at long reach, as well as for duties such as ditching and drainage clearance. As with the standard machines, Tier 4 Interim/Stage IIIB emission certified engine and hydraulics components are used. According to export manager Anil Bingöl, this machine widens Hidromek’s standard excavator
  • Hidromek has developed a long reach excavator
    February 6, 2013
    A new version of Hidromek’s well accepted HMK220LC excavator is being offered with a long reach boom for use in special earthmoving and drainage applications. Called the HMK200LC LR, this machine is designed for fine grading at long reach, as well as for duties such as ditching and drainage clearance. As with the standard machines, Tier 4 Interim/Stage IIIB emission certified engine and hydraulics components are used. According to export manager Anil Bingöl, this machine widens Hidromek’s standard excavator
  • Atlas Copco’s new Boomer E- series
    January 6, 2017
    Atlas Copco says its new Boomer E-series underground mining and tunnelling rigs, available via Atlas Copco’s own worldwide sales organisation from 2013, offers the next generation of rig control system with an improved user interface, including a new intuitive touch-screen, and user-friendly design. “With these improvements, we are confident that the new Boomer series offers one of the most powerful and productive underground mining rigs and tunnelling rigs on the market,” says, Johan Jonsson, product manag
  • Atlas Copco’s new Boomer E- series
    February 13, 2013
    Atlas Copco says its new Boomer E-series underground mining and tunnelling rigs, available via Atlas Copco’s own worldwide sales organisation from 2013, offers the next generation of rig control system with an improved user interface, including a new intuitive touch-screen, and user-friendly design. “With these improvements, we are confident that the new Boomer series offers one of the most powerful and productive underground mining rigs and tunnelling rigs on the market,” says, Johan Jonsson, product manag