Skip to main content

Missouri’s Blanchette Bridge gets smaller and smaller

Missouri’s Blanchette Bridge is now even more abridged. Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012. More than 2,000tonnes of steel dropped over 300m into the Missouri River. A 107m section of the Blanchette Bridge was brought down last month. The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.
December 10, 2012 Read time: 1 min
Missouri’s Blanchette Bridge is now even more abridged.

Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012.

As a result of the latest explosion over 300m of steel, weighing more than 2,000tonnes, dropped into the Missouri River.

A 107m section of the Blanchette Bridge was brought down last month.

The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The bridge that keeps getting smaller www.demolitionnews.com false http://www.demolitionnews.com/2012/12/04/video-the-bridge-that-keeps-getting-smaller/ false false%>

Related Content

  • AGS demonstrates the power of its new 3D application for the ID4 anti-collision crane safety management system
    January 6, 2017
    Crane and site safety management specialist AGS, which also makes and supplies elevated obstruction lighting , anemometers and anti-collision systems, will use Bauma to demonstrate its new 3D application for the ID4 anti-collision crane management system. AGS has more than 5,000 systems in use on construction sites around the world and it has a long-term strategic partnership agreement with Bouygues Construction. The group will also announce the setting up of three new subsidiaries in Rhône-Alpes, Île-de-Fr
  • AGS demonstrates the power of its new 3D application for the ID4 anti-collision crane safety management system
    March 27, 2013
    Crane and site safety management specialist AGS, which also makes and supplies elevated obstruction lighting , anemometers and anti-collision systems, will use Bauma to demonstrate its new 3D application for the ID4 anti-collision crane management system. AGS has more than 5,000 systems in use on construction sites around the world and it has a long-term strategic partnership agreement with Bouygues Construction. The group will also announce the setting up of three new subsidiaries in Rhône-Alpes, Île-de-Fr
  • Simem brings concrete batching plant to bauma
    January 6, 2017
    Focal point of Simem’s stand at bauma was an example of its Eagle portable concrete batching plant, which is said to offer top performance at lower cost without compromising the firm’s emphasis on quality. Modular elements with pre-installed pneumatic-electric systems are the key to enabling swift transfer of the Eagle plant from one project to the other. The ‘super-mobile’ MMX range of plant from Simem – said to be the best solution available for faster moving sites such as railways and highways – was also
  • Simem brings concrete batching plant to bauma
    April 22, 2013
    Focal point of Simem’s stand at bauma was an example of its Eagle portable concrete batching plant, which is said to offer top performance at lower cost without compromising the firm’s emphasis on quality. Modular elements with pre-installed pneumatic-electric systems are the key to enabling swift transfer of the Eagle plant from one project to the other. The ‘super-mobile’ MMX range of plant from Simem – said to be the best solution available for faster moving sites such as railways and highways – was also