Skip to main content

Missouri’s Blanchette Bridge gets smaller and smaller

Missouri’s Blanchette Bridge is now even more abridged. Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012. More than 2,000tonnes of steel dropped over 300m into the Missouri River. A 107m section of the Blanchette Bridge was brought down last month. The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.
December 10, 2012 Read time: 1 min
Missouri’s Blanchette Bridge is now even more abridged.

Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012.

As a result of the latest explosion over 300m of steel, weighing more than 2,000tonnes, dropped into the Missouri River.

A 107m section of the Blanchette Bridge was brought down last month.

The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The bridge that keeps getting smaller www.demolitionnews.com false http://www.demolitionnews.com/2012/12/04/video-the-bridge-that-keeps-getting-smaller/ false false%>

Related Content

  • Navgeocom acquired by Hexagon
    January 30, 2013
    Leica Geosystems is to expand its operations following a move by its parent, Hexagon. Under the terms of this deal, Hexagon will acquire all outstanding shares of Navgeocom, which is the largest Russian distributor for Leica Geosystems. The acquisition marks another step in Hexagon's global distribution strategy, which aims to establish a strong direct presence in key markets. This will help Hexagon’s presence in Russia, which is benefiting from significant expenditure on infrastructure development at prese
  • Marini’s eTOWER 2500 of strength
    April 8, 2013
    Marini’s new eTOWER 2500 asphalt plant on show at bauma 2013 is capable of producing 200tonnes/hour of asphalt. Details of the full Fayat-owned Marini brand range will also be available at the world’s biggest construction equipment show in the Fayat Group’s ‘Asphalt Pavilion’. The Pavilion, which will include touchscreen and videowall presentations, will include a special focus on Marini mobile and warm mix asphalt lines.
  • Guntert & Zimmerman is offering sophisticated stringless paving controls
    January 6, 2017
    The NoLine system now offered by Guntert & Zimmerman for its concrete slipform pavers offers the capability to do away with stringlines for controlling paving oeprations. This kit is offered as an option on all G&Z pavers and support equipment and comprises a software upgrade and a hardware kit. The NoLine software upgrade integrates the stringless technology directly into the paver’s CANBus network. Meanwhile the NoLine hardware kit provides telescopic masts for the total station prisms for use on the pave
  • Hidromek is developing wheeled loaders
    February 6, 2013
    Hidromek is commencing work on developing its new wheeled loader line. Export manager Anil Bingöl said, “We have started our wheeled loader project and we hope to have our first prototype machine this year.” This will feature a 3m3 bucket and will be the first in a range of wheeled loaders from the firm. Machines with bucket capacities of 4m3 and then 5m3 will be developed in due course. Testing of the first prototype will be carried out in Turkey and Bingöl said the firm intends to have its wheeled loaders