Skip to main content

Missouri’s Blanchette Bridge gets smaller and smaller

Missouri’s Blanchette Bridge is now even more abridged. Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012. More than 2,000tonnes of steel dropped over 300m into the Missouri River. A 107m section of the Blanchette Bridge was brought down last month. The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.
December 10, 2012 Read time: 1 min
Missouri’s Blanchette Bridge is now even more abridged.

Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012.

As a result of the latest explosion over 300m of steel, weighing more than 2,000tonnes, dropped into the Missouri River.

A 107m section of the Blanchette Bridge was brought down last month.

The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The bridge that keeps getting smaller www.demolitionnews.com false http://www.demolitionnews.com/2012/12/04/video-the-bridge-that-keeps-getting-smaller/ false false%>

Related Content

  • ZF looks to the future with HVT and hybrid technology
    February 7, 2013
    ZF will focus on efficiency and reducing fuel consumption at this year’s show. The transmission and driveline component manufacturer will present its Ergopower efficiency package that combines the cPower continuously variable transmission with the ZF Hybrid module that should be commercially available in the future. cPower is a hydromechanical variable transmission that combines hydrostatic drive pumps with a mechanical powershift gearbox. Available for use in a range of machines, including wheeled loaders,
  • Montreal’s Champlain Bridge opens but late and over-budget
    June 27, 2019
    Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports. Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River. The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. Accord
  • IRF Geneva carries out road statistics seminar
    June 28, 2013
    IRF Geneva has carried out a successful webinar on World Road Statistics for Beginners - Techniques and Methods. Participants from all over the world joined in to the key messages and techniques from this webinar. This addressed the core characteristics of raw data brought together in the annual World Road Statistics report, which is one of IRF’s flagship projects. Published since 1964, this publication remains the single comprehensive source of data for the international road, traffic and transport sectors
  • Fiorella Industrie is vital component
    January 6, 2017
    Fiorella Industrie is a vibrant firm specialising in the manufacture of tie rods, tie rod ends, ball joints, axial ball joints and other steering and suspension components for tractors, agricultural machinery, off-highway and automotive vehicles.