Skip to main content

Missouri’s Blanchette Bridge gets smaller and smaller

Missouri’s Blanchette Bridge is now even more abridged. Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012. More than 2,000tonnes of steel dropped over 300m into the Missouri River. A 107m section of the Blanchette Bridge was brought down last month. The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.
December 10, 2012 Read time: 1 min
Missouri’s Blanchette Bridge is now even more abridged.

Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012.

As a result of the latest explosion over 300m of steel, weighing more than 2,000tonnes, dropped into the Missouri River.

A 107m section of the Blanchette Bridge was brought down last month.

The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The bridge that keeps getting smaller www.demolitionnews.com false http://www.demolitionnews.com/2012/12/04/video-the-bridge-that-keeps-getting-smaller/ false false%>

Related Content

  • ESCO range offers Hydra Shearer drums
    April 18, 2013
    Hydra shearer drums, now part of the ESCO family of mining products, have been engineered with radial-style picks and tool holders that are recessed into the vane to deliver optimum cutting performance. The result is reduced wear on the drum, increased product size and lower power consumption. The range of shearer drums can also be equipped with conical style picks.
  • Jaws II for Robi demolition grapple
    January 6, 2017
    New P-jaws make Ramtec’s Robi DG15RP demolition grapple ideal for recycling applications. The DG grapples are especially designed for light demolition projects such as wooden buildings, bricks, concrete without rebar, and for sorting and loading demolition debris in scrap yards.
  • Jaws II for Robi demolition grapple
    February 3, 2012
    New P-jaws make Ramtec’s Robi DG15RP demolition grapple ideal for recycling applications. The DG grapples are especially designed for light demolition projects such as wooden buildings, bricks, concrete without rebar, and for sorting and loading demolition debris in scrap yards.
  • Sunderland’s sliding bridge slips across the Wear
    October 26, 2016
    Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation next year likely. The project to build the New Wear Crossing is now half way through with the first half of the steel deck bridge poised mid-river. Completion of the bridge is expected in the spring of 2018. This month, hydraulic jack