Skip to main content

Missouri’s Blanchette Bridge gets smaller and smaller

Missouri’s Blanchette Bridge is now even more abridged. Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012. More than 2,000tonnes of steel dropped over 300m into the Missouri River. A 107m section of the Blanchette Bridge was brought down last month. The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.
December 10, 2012 Read time: 1 min
Missouri’s Blanchette Bridge is now even more abridged.

Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012.

As a result of the latest explosion over 300m of steel, weighing more than 2,000tonnes, dropped into the Missouri River.

A 107m section of the Blanchette Bridge was brought down last month.

The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The bridge that keeps getting smaller www.demolitionnews.com false http://www.demolitionnews.com/2012/12/04/video-the-bridge-that-keeps-getting-smaller/ false false%>

Related Content

  • GCS Flex system is important introduction for Trimble
    January 6, 2017
    Roz Buick, vice president Heavy Civil Construction at Trimble, has highlighted some key technology introductions from the firm. The GCS Flex system is an important introduction for Trimble and Buick explained, “The idea is to install a less complex system. We want to attract customers from the smaller contractors.” Comparatively low cost for a machine-control system, the basic GCS Flex package offers entry-level 2D technology and it can be upgraded to what Buick calls a ‘2½D’ system.
  • GCS Flex system is important introduction for Trimble
    April 17, 2013
    Roz Buick, vice president Heavy Civil Construction at Trimble, has highlighted some key technology introductions from the firm. The GCS Flex system is an important introduction for Trimble and Buick explained, “The idea is to install a less complex system. We want to attract customers from the smaller contractors.” Comparatively low cost for a machine-control system, the basic GCS Flex package offers entry-level 2D technology and it can be upgraded to what Buick calls a ‘2½D’ system.
  • Construction Software Supplement: Software for Road Infrastructure is now available
    January 16, 2015
    Construction software is developing at a rapid pace today. World Highways’ special supplement, Software For Road Infrastructure, takes a close look at key technological developments within this sector.
  • Lombardini powers up the 8kW KD15-440
    January 6, 2017
    The Kohler/Lombardini group will use Bauma to update its range of air-cooled single cylinder diesel engines, unveiling the new 8kW KD15-440 engine which the manufacturer says will strengthen and improve the current 15LD series - elevating it to the top of the class within its power range. The KD15-440 is an air-cooled single cylinder diesel engine with a displacement of 441cc and an air filter that can offer, Lombardini claims, an operating life five times greater than the current version via its new high-e