Skip to main content

Missouri’s Blanchette Bridge gets smaller and smaller

Missouri’s Blanchette Bridge is now even more abridged. Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012. More than 2,000tonnes of steel dropped over 300m into the Missouri River. A 107m section of the Blanchette Bridge was brought down last month. The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.
December 10, 2012 Read time: 1 min
Missouri’s Blanchette Bridge is now even more abridged.

Just a few weeks after explosives took out the West Struss Span, the remaining steel truss on the bridge’s westbound lanes was blown up by demolition crews on Tuesday December 5, 2012.

As a result of the latest explosion over 300m of steel, weighing more than 2,000tonnes, dropped into the Missouri River.

A 107m section of the Blanchette Bridge was brought down last month.

The Blanchette Bridge blasting is part of a US$63 million, year-long project to replace the westbound span.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The bridge that keeps getting smaller www.demolitionnews.com false http://www.demolitionnews.com/2012/12/04/video-the-bridge-that-keeps-getting-smaller/ false false%>

Related Content

  • Percussive diamond inserts from Element Six lead to longer mining drill life
    February 7, 2013
    Synthetic diamond division of DeBeers, Element Six, has developed the 3D Percussive Diamond Insert (PDI) that it claims will radically cut costs in the mining drill industry. The 3D PDI uses the firm’s polycrystalline diamond technology to optimise wear and impact resistance properties, while improving penetration rates for the drill bit. The firm claims that tests of the drill insert show up to 10 times the drill life of a conventional tungsten carbide insert., greatly reducing costly rig downtime for serv
  • Accurate load weighing system from Loadrite
    February 13, 2013
    The Loadrite L2150 wheeled loader bucket weighing system is said to offer increased accuracy and reliability. The system is said to ensure haul trucks can be loaded properly, improving overall productivity by ensuring operational efficiency. Using this weighing system trucks are neither under-loaded nor over-loaded, with the ensuing associated productivity losses and excess machine wear problems respectively, all but eliminated. Aimed at use in large quarry operations the new Loadrite L2150 unit is said to
  • Engcon improves tilt-rotator design
    January 6, 2017
    Engcon has introduced a new range of tilt-rotators, using a cast housing to greatly increase capacity. The EC218 and EC226 replace the EC15 and EC20 respectively. The former is suitable for machines up to 18tonnes in operating weight, while the latter is designed for excavators up to 26 tonnes. The cast housing incorporates internal lubrication channels for centralised greasing, reducing the risk of dust ingress or damage while operating. Larger bushes are used to reduce the chance of play in the housing
  • Engcon improves tilt-rotator design
    April 19, 2012
    Engcon has introduced a new range of tilt-rotators, using a cast housing to greatly increase capacity. The EC218 and EC226 replace the EC15 and EC20 respectively. The former is suitable for machines up to 18tonnes in operating weight, while the latter is designed for excavators up to 26 tonnes. The cast housing incorporates internal lubrication channels for centralised greasing, reducing the risk of dust ingress or damage while operating. Larger bushes are used to reduce the chance of play in the housing