Skip to main content

Mexico’s ‘most complex’ Durango-Mazatlan highway opens

The US$2.16 billion (MXN28 billion) Durango-Mazatlan highway, considered to be the most complex road project in Mexico, has now opened. The 230km long, 63-tunnel route links the Pacific with the Central-North of the country and then the Gulf of Mexico. Construction of the road was awarded to Tradeco Industrial, Omega Corporation and PCC Construccion and la Peninsular. Ancillary work was awarded to Grupo Mexicano in a contract worth $26.02 million (MXN339 million) that included pavements, installation
October 16, 2013 Read time: 1 min
The US$2.16 billion (MXN28 billion) Durango-Mazatlan highway, considered to be the most complex road project in Mexico, has now opened.

The 230km long, 63-tunnel route links the Pacific with the Central-North of the country and then the Gulf of Mexico.

Construction of the road was awarded to Tradeco Industrial, Omega Corporation and PCC Construccion and la Peninsular. Ancillary work was awarded to Grupo Mexicano in a contract worth $26.02 million (MXN339 million) that included pavements, installation of fibre optics, signalling and drainage.

Related Content

  • Colombia road projects delivered
    September 24, 2020
    Important road projects in Colombia have been delivered successfully.
  • Mexican authorities set out plan for infrastructure
    March 18, 2014
    The Mexican authorities have set out further details on the country’s ongoing infrastructure development plans. Mexico's Transport and Communications Secretariat (SCT) will commence the call for proposals process for highway projects worth a total of US$2.11 billion. The projects include the Paso Express de Cuernavaca, Tuxpan-Tampico highway, Ciudad Obrego by-pass and Barretal by-pass. They also include widening the Tlalpan and Puebla routes. Around $4.366 billion will be invested in roads in Mexico during
  • Foundations for Mexico highway with help from Liebherr
    November 9, 2017
    A Liebherr rotary drill rig and oscillator combination has been working in Mexico on a highway project for contractor Mota-Engil. A Liebherr piling rig is playing an important role on a major Mexican highway construction project being carried out by a division of the Portuguese firm Mota-Engil. The use of the rig by Mota-Engil Mexico’s newly formed geotechnical division is helping to set new quality standards for piling in the country. The contractor is leasing one of the latest Liebherr LB 24-270 rotary
  • Santiago’s Autopista Central in line for improvements
    June 18, 2015
    Motorway operator Autopista Central de Chile (AC) has applied to the Ministry of Public Works to make improvements worth around US$340 million to the Autopista Central system in the capital Santiago. Improvements are scheduled for the Quilicura area. AC will present an environmental impact and engineering study this summer to the ministry. Much of the work will take place at night time to avoid traffic disruption. Autopista Central consists of two highways, the westernmost of which branches off from t