Skip to main content

Mexico's cable-stayed bridge highest in the world

Mexico’s newly opened Baluarte Bridge crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. The 1.12km long bridge is 403m high at its central point, making it the highest cable-stayed structure in the world, and a Guinness Book of Records entrant. It is part of a new highway connecting Mazatlan on Mexico’s Pacific Coast with Durango.
May 11, 2012 Read time: 1 min
Mexico’s newly opened Baluarte Bridge crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. The 1.12km long bridge is 403m high at its central point, making it the highest cable-stayed structure in the world, and a Guinness Book of Records entrant. It is part of a new highway connecting Mazatlan on Mexico’s Pacific Coast with Durango.

Related Content

  • Latest VMS keeps world’s motorists moving safely
    April 10, 2013
    VMS for what is thought to be the longest road tunnel in the Middle East, and the installation of the latest VMS technology in Canada’s oldest national park to help motorists travelling through it are among the projects discussed by Guy Woodford. A large volume of VMS from Italian firm Solari has been installed in the new 4.2km-long Zayed Street Tunnel in Abu Dhabi – thought to be the longest in the Middle East. The Solari VMS supply consisted of 204 lane control signs, with Red, Yellow and Green LED pre-de
  • Framework solutions speed bridge construction
    February 24, 2012
    Framework plays a key role in construction of bridges and other major infrastructure works – Mike Woof writes Speeding construction processes can help reduce costs considerably and the latest formwork solutions can provide significant benefits in this regard. In many projects the use of standardized and modular formwork solutions can play a key role, reducing the planning and systems required for bridge building work.
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • Flatiron and Dragados win Corpus Christi Bridge deal
    June 25, 2015
    The Texas Transportation Commission has conditionally awarded the two companies, Flatiron and Dragados the contract to design, build and operate a new cable stayed Corpus Christi Harbor Bridge.