Skip to main content

Mexico's cable-stayed bridge highest in the world

Mexico’s newly opened Baluarte Bridge crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. The 1.12km long bridge is 403m high at its central point, making it the highest cable-stayed structure in the world, and a Guinness Book of Records entrant. It is part of a new highway connecting Mazatlan on Mexico’s Pacific Coast with Durango.
May 11, 2012 Read time: 1 min
Mexico’s newly opened Baluarte Bridge crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. The 1.12km long bridge is 403m high at its central point, making it the highest cable-stayed structure in the world, and a Guinness Book of Records entrant. It is part of a new highway connecting Mazatlan on Mexico’s Pacific Coast with Durango.

Related Content

  • Building Norway's longest suspension bridge
    March 2, 2012
    AT 1.38KM LONG, the new €213 million Hardanger Bridge crossing Hardangerfjord, Norway's second largest fjord, will be the country's longest suspension bridge. The structure, designed by Norway's Forum Arkitekter, will be a new landmark with its 200m high concrete towers and steel construction.
  • Controversial Russian bridge opens
    May 16, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link opening to use by cars. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Kamaz truck to reach the city of Kerch. The US$2.7 billion bridge forms part of
  • VIDEO: Sarens raises the pylon for New Wear Crossing in Sunderland
    February 13, 2017
    It was as weekend working in Sunderland city, northeast England, for global lifting specialist 8569 Sarens.

    Over the two days, the Belgian company gently raised a 1,550tonne steel pylon that will form the backbone of the New Wear Crossing – no official name yet – across the River Wear.

    General work on the two-span cable-stay bridge started on the bridge in May 2015. The structure will be supported by the single double pylon and will have four vehicle lanes, as well as dedicated cycle and pedestrian routes.
  • Severn Bridges deal for Amey
    December 3, 2020
    Amey Transport Infrastructure is handling maintenance for the Severn Bridges in the UK.